PO.PP.Vsh.Spectrometric
Three shale indices from a spectral gamma ray log, returned as one row: thorium, potassium, then the uranium-free curve. Each index is the linear pick between the clean and shale responses of that curve. Thorium and potassium avoid uranium that is not in the clay, which is why the total gamma ray on its own misleads in a radioactive sand. I_Th = (Th_log − Th_min) / (Th_shale − Th_min), and the same shape for potassium and for the uranium-free gamma ray. The three numbers are not averaged and not reduced to a minimum; that choice is left to the sheet.
Formula
=LAMBDA(Th_log, Th_min, Th_sh, K_log, K_min, K_sh, Uf_log, Uf_min, Uf_sh, HSTACK((Th_log-Th_min)/(Th_sh-Th_min), (K_log-K_min)/(K_sh-K_min), (Uf_log-Uf_min)/(Uf_sh-Uf_min)))Parameters
| Parameter | Unit | Description |
|---|---|---|
Th_log |
ppm | Thorium in the zone of interest |
Th_min |
ppm | Thorium in the lowest-radioactivity zone |
Th_sh |
ppm | Thorium in shale |
K_log |
percent | Potassium in the zone of interest |
K_min |
percent | Potassium in the lowest-radioactivity zone |
K_sh |
percent | Potassium in shale |
Uf_log |
API | Uranium-free gamma ray in the zone of interest |
Uf_min |
API | Uranium-free gamma ray in the lowest-radioactivity zone |
Uf_sh |
API | Uranium-free gamma ray in shale |
Examples
| Invocation | Expected |
|---|---|
=PO.PP.Vsh.Spectrometric(8, 2, 14, 2, 0.5, 3.5, 40, 10, 70) |
[0.5, 0.5, 0.5] |
=PO.PP.Vsh.Spectrometric(6, 2, 14, 1.5, 0.5, 3.5, 25, 10, 70) |
[0.33333333, 0.33333333, 0.25] |
Related lambdas
PO.PP.F.ArchieFormation resistivity factor from Archie's equation. It is the ratio of the resistivity of a rock fully saturated with water to the resistivity of that water, expressed through porosity. F = a / φ^m. Porosity is a fraction. a and m come from a log-log plot of F against porosity, or from a named pair such as Humble.PO.PP.Sw.ArchieWater saturation in a clean formation from the general Archie equation. Porosity, water resistivity and true resistivity fix the bulk volume of water once the tortuosity factor, cementation exponent and saturation exponent are chosen. Sw = ((a / φ^m) * (Rw / Rt))^(1/n). Porosity is a fraction, resistivities are ohm·m, and a, m and n are dimensionless. With Vsh = 0 the shaly-sand equations in this batch reduce toward this one, at the a and m those equations bake in.PO.PP.Perm.Carothers.SandstoneSandstone permeability from the formation factor, the correlation Carothers published in 1968. It is a statistical fit, not a pore-scale derivation, and it applies to sandstones. The limestone fit is a different equation and is not this one. k = 7×10^8 / F^4.5, with k in millidarcies and F dimensionless.PO.PP.Vsh.ClavierShale volume from the gamma-ray index by Clavier's nonlinear curve. Like the Larionov transforms it reads less shale than the linear index in the middle of the range, and it meets the index at both ends. Returns Vsh as a fraction.PO.PP.Perm.CoatesPermeability from porosity and irreducible water saturation by the Coates free-fluid form, in which the ratio of free to bound fluid, (1 − Swirr)/Swirr, carries the pore-size effect. It is the same idea as the NMR Coates model, written with a log Swirr in place of the NMR bound-fluid volume. Returns k in mD.PO.PP.Porosity.FromDensityPorosity from the density log in a clean formation. The bulk density sits between the matrix density and the fluid density, and the fraction of the way across is the porosity. φ = (ρma − ρb) / (ρma − ρf). All three densities share one unit, g/cm³ on a density log. Shale and gas corrections are not in this equation.
Used in blueprints
- Shale Volume from Gamma RayHow much shale a sand holds from its gamma ray, by the linear index and the Larionov, Clavier and Steiber transforms, and the net sand each makes.
- Net Pay and Cutoffs over an IntervalHow much of an interval is net reservoir and net pay by shale-volume, porosity and Sw cutoffs, and how much the answer depends on the cutoffs.
Need a custom LAMBDA? Suggest a new one