PO.PE.Loading.TurnerRate
Description
Is the gas well flowing fast enough to carry its liquid out? Turner, Hubbard and Dukler (1969) found that a gas well unloads while the gas moves fast enough to lift the largest liquid drop it carries, and loads up when it doesn't: the drop falls back, liquid gathers at the bottom, and its head kills the well. The LAMBDA returns the critical gas rate at that velocity, in MMscf/d, at a pressure and temperature in a tubing size. Read at the wellhead, where the gas is least dense and the critical rate usually the highest, it is the least rate the well must make to stay unloaded. A rate below it is a loading well; a smaller tubing raises the velocity at the same rate and lowers the critical rate. The gas's Z-factor and density come from the pressure and temperature, by Dranchuk-Abou-Kassem at Sutton's pseudo-critical properties.
Formula
=LAMBDA(p, t, sg_g, tubing_id, sigma, rho_l, factor, IF(OR(p<=0, t<=-459.67, sg_g<=0, tubing_id<=0, sigma<=0, rho_l<=0, factor<=0), NA(), LET(
tr, t+459.67, z, PO.PVT.Z.ByDAK(p/PO.PVT.Ppc.BySutton(sg_g), tr/PO.PVT.Tpc.BySutton(sg_g)), rho_g, PO.PVT.Rho.Gas.ByDefinition(p, tr, sg_g, z)*62.428, IF(rho_l<=rho_g, NA(), 3.06*p*factor*1.593*sigma^0.25*(rho_l-rho_g)^0.25/rho_g^0.5*PI()*tubing_id^2/576/(tr*z)))))Parameters
| Parameter | Unit | Description |
|---|---|---|
p |
psia | Flowing pressure the rate is read at, usually the wellhead's; above 0 |
t |
°F | Flowing temperature there |
sg_g |
— | Gas specific gravity (air = 1), a sweet gas; above 0 |
tubing_id |
in | Tubing inner diameter; above 0 |
sigma |
dyne/cm | The liquid's surface tension against the gas: 60 for water, 20 for condensate in Turner's paper; above 0 |
rho_l |
lb/ft³ | The liquid's density: 67 for water, 45 for condensate in Turner's paper; above the gas's |
factor |
— | The upward adjustment on the critical velocity: 1.2, Turner's, or 1, Coleman's for wellhead pressures under about 1,000 psia; above 0 |
Examples
| Invocation | Expected |
|---|---|
=PO.PE.Loading.TurnerRate(500, 100, 0.7, 2.441, 60, 67, 1.2) |
1.07534 |
=PO.PE.Loading.TurnerRate(500, 100, 0.7, 2.441, 60, 67, 1) |
0.896114 |
=PO.PE.Loading.TurnerRate(500, 100, 0.7, 2.441, 20, 45, 1.2) |
0.737137 |
=PO.PE.Loading.TurnerRate(500, 100, 0.7, 3.958, 60, 67, 1.2) |
2.82723 |
=PO.PE.Loading.TurnerRate(3000, 160, 0.7, 2.441, 60, 67, 1.2) |
2.51299 |
=PO.PE.Loading.TurnerRate(100, 120, 0.6, 1.995, 60, 67, 1.2) |
0.331315 |