Field Production Profile — Buildup-Plateau-Decline

Three-phase field production profile with formula-derived phase transitions. Named input cells for buildup time, plateau duration, plateau rate, and decline parameters. 25 time steps out to 120 months.


Inputs

Named cells you can edit — every result recalculates from them.

Name Description Default Unit
FPP_tBU Buildup Time 6 months
FPP_tPlat Plateau Duration 24 months
FPP_Qplat Plateau Rate 5000 bbl/day
FPP_Di Initial Decline (Di) 0.03 1/month
FPP_b b-Exponent 0.5 (0=exp, 1=harmonic)

2 sheets, shown with the values the file opens with

A B C D E F
1 Field Production Profile — Inputs
2 Three-phase production profile: linear buildup to plateau, constant plateau rate, then Arps decline. Phase transitions are formula-derived from these parameters — change the buildup time or plateau duration and the entire profile updates.
3
4 Profile Parameters
5 Buildup Time 6 months
6 Plateau Duration 24 months
7 Plateau Rate 5000 bbl/day
8 Initial Decline (Di) 0.03 1/month
9 b-Exponent 0.5 (0=exp, 1=harmonic)
10
11 Derived Phase Boundaries
12 Buildup ends at 6 months
13 Plateau ends at 30 months
14 Total profile duration 120 months
Opens inNeeds the Petroleum Office add-in: its PO functions show #NAME? without it once Excel recalculates.
Functions used PO.FPP.Field.ProdPO.FPP.Field.Rate
FileProfilesFunctions.xlsx, 12 KB
CategoryProduction
For agents and tools Structure (.json) · Descriptor (.md)
Tags:
production-profilebuildup-plateau-declinefield-forecast

Need a workbook we don't have? Suggest a Workbook