PO.WI.PA.BalancedPlug
Description
Placement of a balanced cement plug through an open-ended string: the spacer to pump behind the cement so the columns inside and outside the pipe balance, the plug height with the pipe in, its height after the pipe is pulled, and the displacement. Returns four cells: spacer behind (bbl), plug height with the pipe in (ft), plug height after pulling out (ft), displacement (bbl).
Formula
=LAMBDA(Slurry_bbl, Ahead_bbl, PlugHoleID_in, StringOD_in, StringID_in, Base_ft, LET(
capA, (PlugHoleID_in^2 - StringOD_in^2)/1029.4,
capP, StringID_in^2/1029.4,
hIn, Slurry_bbl/(capA + capP),
behind, Ahead_bbl*capP/capA,
HSTACK(behind, hIn, Slurry_bbl/(PlugHoleID_in^2/1029.4), capP*(Base_ft - hIn) - behind)))Parameters
| Parameter | Unit | Description |
|---|---|---|
Slurry_bbl |
bbl | Slurry volume, from PO.DE.Cement.Volume (casing OD 0, the plug length as the open-hole length) |
Ahead_bbl |
bbl | Spacer pumped ahead of the cement |
PlugHoleID_in |
in | Hole or casing inside diameter at the plug |
StringOD_in |
in | Outside diameter of the string at the plug (the stinger) |
StringID_in |
in | Inside diameter of the string |
Base_ft |
ft | Depth of the string's end, the plug base |
Examples
| Invocation | Expected |
|---|---|
=INDEX(PO.WI.PA.BalancedPlug(37.9, 10, 6.25, 2.875, 2.44, 9600), 1, 2) |
1059 |
=INDEX(PO.WI.PA.BalancedPlug(37.9, 10, 6.25, 2.875, 2.44, 9600), 1, 3) |
1000 |
=PO.WI.PA.BalancedPlug(37.9, 10, 6.25, 2.875, 2.44, 9600) |
[1.933183, 1061.598796, 998.765056, 47.4492] |
=PO.WI.PA.BalancedPlug(30, 20, 8.5, 5, 4.276, 8000) |
[7.739334, 471.235039, 427.432526, 125.986393] |