PO.DE.AnnularVelocity


Description

Average upward velocity of the mud in an annulus, the first check on hole cleaning. AV = 24.5 Q / (Dh² − Dp²) ft/min, with Q in gpm and the diameters in inches.

Formula

=LAMBDA(Q_gpm, Dh_in, Dp_in, 24.5 * Q_gpm / (Dh_in^2 - Dp_in^2))

Parameters

Parameter Unit Description
Q_gpm gpm Flow rate
Dh_in in Hole diameter, or casing inside diameter
Dp_in in Pipe outside diameter

Examples

Invocation Expected
=PO.DE.AnnularVelocity(500, 8.5, 5) 259.25926
=PO.DE.AnnularVelocity(900, 12.25, 5) 176.31184

Need a custom LAMBDA? Suggest a New Lambda