Surface casing pressure at which the shoe would break down, with the current mud in the hole. MAASP = (EMW_LOT − MW) × 0.052 × TVD_shoe psi, with EMW_LOT the leak-off test result as an equivalent mud weight.
The nitrogen precharge of an accumulator bank that gives up a stated volume of fluid as its pressure falls from one value to another, by Boyle's law. One formula answers two questions. Measured: draw V_drawn gal from the bank with the charge pumps off, read the pressure before and after, and it returns the bank's average precharge. Design: put the fluid a stack needs as V_drawn, the fully charged pressure as P_start and the minimum operating pressure as P_final, and it returns the lowest precharge that still delivers that fluid above the minimum.
Pressure left in an accumulator bottle after some of its fluid is used. P = V P_pre / (V P_pre / P_max + V_drawn) psi: the nitrogen volume at P_max grows by the fluid drawn.
Hydraulic fluid one accumulator bottle delivers between its maximum and minimum operating pressures. V_usable = V × P_pre × (1/P_min − 1/P_max) gal, Boyle's law on the nitrogen precharge (isothermal).
One hole section of a time-depth (days versus depth) curve and its cost: drilling time from the ROP, round trips to the section's base, and flat time, priced at the spread rate plus the section's fixed costs, and added to the totals of the sections above. Returns four cells: section days, cumulative days, section cost and cumulative cost.
Volume per foot of the annulus between a hole (or casing ID) and the pipe inside it. Capacity = (Dh² − Dp²) / 1029.4 bbl/ft, with Dh the hole or casing inside diameter and Dp the pipe outside diameter.
Average upward velocity of the mud in an annulus, the first check on hole cleaning. AV = 24.5 Q / (Dh² − Dp²) ft/min, with Q in gpm and the diameters in inches.
This website uses cookies to enhance your experience and analyze site usage.
By clicking "Accept", you consent to the use of cookies for analytics purposes.
Read our privacy policy