Modified Hyperbolic Decline

How much of an Arps EUR survives once the decline switches to a terminal exponential, with the switch time and the reduced EUR.

Decline Curve Analysis 137 rows × 7 columnsMicrosoft 365

Use this blueprint

How to use this blueprint
  1. In Excel, go to the Petroleum Office ribbon tab and click Blueprint Manager
  2. Search for Modified Hyperbolic Decline
  3. Click on the blueprint to preview
  4. Click Insert to place it into your worksheet. Modify the input values to match your data.

Requires the Petroleum Office add-in for Excel. Needs Microsoft 365 or Excel 2024: it uses a function Excel 2016 doesn't have (LAMBDA), which shows #NAME? there.

Get Petroleum Office

Description

How much of an Arps forecast's EUR survives a realistic terminal decline? The modified hyperbolic follows the well's Arps hyperbolic until its falling decline reaches a terminal decline, then goes on as an exponential at that decline (Robertson, 1988). You enter the Arps qi, Di and b, the terminal decline and an economic-limit rate. You read off when the switch happens, the rate and cumulative there, and the life and EUR to the limit with and without the terminal decline.

Parameters:

  • Decline: the initial oil rate MHD_qi (STB/d), the initial nominal decline MHD_Di (1/yr) and the hyperbolic exponent MHD_b
  • Terminal decline: MHD_Dlim, effective per year as it is usually quoted, with the usual range MHD_DlimLo to MHD_DlimHi
  • Limit: the economic-limit oil rate MHD_QEcon (STB/d)
  • Grid and history: the step MHD_Step (months per row, 60 steps) and the largest RMSE allowed over the history's mean rate, MHD_FitMax

How to use it: Fit qi, Di and b to the well's rates against time on production (with the Arps fitter, or the modified hyperbolic fitter for all four), and take the terminal decline from older analogue wells in the same play that have reached it, not from the well's own early months. Check that the terminal decline sits inside the usual range, that the switch comes before the limit, and that the forecast matches the well's 24-month history. Then read the share of the EUR the terminal decline takes off. The two forecasts run side by side in a grid, with their rates on a log scale over the history and their cumulatives in two charts.

Method: The sheet computes in months, with rates in STB/d and cumulatives turned into barrels by the days in a month (30.4375). The effective terminal decline becomes a nominal one, −ln(1 − Dlim) per year, then a monthly one. The hyperbolic's nominal decline Di/(1 + b·Di·t) falls to that at t = (Di/Dlim − 1)/(b·Di), where the rate is qi·(Dlim/Di)^(1/b). From there the rate is exponential at Dlim. The time to the limit and the cumulative to it are taken along that path, and along the Arps hyperbolic with no switch for comparison. The history match is the RMSE between the history's rates and the forecast's, over the history's mean rate.

Example: The default case is the decline family's reference well, the same on the four decline sheets: a tight-oil horizontal well whose first 24 months of oil rate fall from 895 to 199 STB/d, with its fitted Arps qi = 1,020 STB/d, Di = 1.89/yr and b = 0.93. The terminal decline is 8 %/yr effective, inside the 5 to 10 %/yr usual for such wells, and the economic limit 15 STB/d.

The 8 %/yr terminal decline is −ln(0.92) = 0.08338/yr nominal, 0.006948/month. The well's decline, 0.1575/month at the start, falls to that after (0.1575/0.006948 − 1)/(0.93 × 0.1575) = 21.667/0.14648 = 147.9 months, 12.3 years, when the rate is 1,020 × (0.006948/0.1575)^(1/0.93) = 35.6 STB/d and 589.5 MSTB is produced. From there the exponential reaches 15 STB/d after ln(35.6/15)/0.006948 = 124.3 months more, at 22.7 years, with an EUR of 679.7 MSTB. Arps alone reaches the limit at 28.2 years with 720.2 MSTB, so the terminal decline takes off 5.6 % of the EUR and 5.5 years of life. The history is all before the switch, so the match is Arps's: an RMSE of 11.7 STB/d, 2.9 % of the mean rate.

Functions used

Names it defines (43)
NameRefers toComment
PO.DCA.ModHyp.Tswitch =LAMBDA(Di, Dlim, b, IF(OR(Di<=0, Dlim<=0, b<=0), NA(), IF(Dlim>=Di, 0, (Di/Dlim-1)/(b*Di)))) Time a modified hyperbolic switches to its terminal exponential: (Di/Dlim - 1)/(b*Di), 0 when Dlim >= Di. Di and Dlim are nominal declines in one time base (1/month gives months) and b the hyperbolic exponent.
MHD_qi $B$4 Initial oil rate, qi, STB/d
MHD_Di $B$5 Initial nominal decline, Di, 1/yr
MHD_b $B$6 Hyperbolic exponent, b
MHD_Dlim $B$7 Terminal decline, effective, %/yr
MHD_QEcon $B$8 Economic-limit oil rate, STB/d
MHD_DlimLo $B$10 Lowest usual terminal decline, effective, %/yr
MHD_DlimHi $B$11 Highest usual terminal decline, effective, %/yr
MHD_Step $B$12 Grid step, months per row
MHD_FitMax $B$13 Largest history mismatch allowed (RMSE over mean rate), %
MHD_Inputs $B$4:$B$13 The Arps qi, Di and b, the terminal decline, the economic-limit rate, the usual terminal-decline range, the grid's step and the history mismatch allowed
MHD_DiM $B$16 Nominal decline per month, Di/12, 1/month
MHD_DlimN $B$17 Terminal decline, nominal, 1/yr
MHD_DlimM $B$18 Terminal decline per month, 1/month
MHD_Tsw $B$20 Time of the switch, years
MHD_qSw $B$21 Oil rate at the switch, STB/d
MHD_NpSw $B$22 Cumulative at the switch, MSTB
MHD_TLim $B$24 Time to the limit, modified hyperbolic, years
MHD_EUR $B$25 EUR, modified hyperbolic, MSTB
MHD_TLimArps $B$26 Time to the limit, Arps alone, years
MHD_EURArps $B$27 EUR, Arps alone, MSTB
MHD_Cut $B$28 EUR the terminal decline takes off, %
MHD_RMSE $B$30 RMSE against the history, STB/d
MHD_RelErr $B$31 RMSE over the history's mean rate, %
MHD_GridEnd $B$32 Time at the grid's end, years
MHD_SwitchCheck $B$33 Switch check verdict
MHD_SwitchCheckNote $C$33 Switch check comment
MHD_DlimCheck $B$34 Terminal decline check verdict
MHD_DlimCheckNote $C$34 Terminal decline check comment
MHD_FitCheck $B$35 History match check verdict
MHD_FitCheckNote $C$35 History match check comment
MHD_GridCheck $B$36 Grid check verdict
MHD_GridCheckNote $C$36 Grid check comment
MHD_Results $B$16:$B$36 The monthly and terminal declines, the switch's time, rate and cumulative, the time to the limit and the EUR with and without the terminal decline, the EUR it takes off, the history RMSE, the grid's end and the four checks
MHD_History $A$45:$D$68 The well's first 24 months: the time, the oil rate measured at the end of each month, and each model's rate at that time
MHD_HistT $A$45:$A$68 History times, months
MHD_HistY $B$45:$B$68 History times, years
MHD_HistQ $C$45:$C$68 History oil rates, STB/d
MHD_HistFit $D$45:$D$68 Modified hyperbolic at the history times, STB/d
MHD_Curve $A$72:$G$132 The forecast grid: time in months and years, the modified hyperbolic and Arps rates and cumulatives, and the economic limit as a reference line
MHD_MoYr $B$135 Months in a year, months/yr
MHD_DMo $B$136 Days in a month, 365.25/12, days/month
MHD_Rows $B$137 Rows of the forecast grid after the first

Details

Inserts137 rows × 7 columns
CategoryDecline Curve Analysis
For agents and toolsDescriptor (.md)
Tagsdecline · modified-hyperbolic · terminal-decline · Arps · exponential · forecast · economic-limit · EUR

Need a custom calculation? Request a blueprint