DCA Auto-Fit Model Comparison


Spreadsheet

25 rows x 4 columns

fx
A B C D
1 DCA Auto-Fit Model Comparison
2 Settings
3 Economic Limit 50 bbl/month
4
5 Fitted Parameters
6 Arps Duong
7 Param 1 3178.597355 2741.073737
8 Param 2 0.1366772263 2.193712404E-05
9 Param 3 0.7751422838 1.46438701
10 Param 4 1.352718923
11 0.9998182108 0.9952611425
12 EUR (bbl) 62767.74571 66918.11425
13
14 Production History
15 Month Rate (bbl/mo) Arps Fit Duong Fit
16 1 2800 2791.360131 2741.073759
17 3 2200 2226.41131 2353.656873
18 6 1700 1684.811055 1698.145527
19 9 1350 1339.866903 1316.701336
20 12 1100 1103.070019 1073.085653
21 18 800 802.3284742 780.632079
22 24 620 621.659974 611.2355877
23 30 500 502.4454206 500.728349
24 36 420 418.5475182 422.9882411
25 48 310 309.3442799 320.978779

Description

Auto-fit Arps hyperbolic and Duong decline models to the same production data, then compare R² and EUR to select the best model. Arps works well for conventional reservoirs; Duong is better for unconventional (tight/shale) with linear flow.

Model selection: Higher R² = better fit. If both fit well, compare EUR — Arps with b > 1 can overestimate reserves.

Workflow

  • Inputs: Monthly production history (time in months, rate in bbl/month)
  • Step 1: Auto-fit Arps parameters (Qi, Di, b) and Duong parameters (q1, qInf, a, m)
  • Step 2: Compute fitted rates and R² for each model
  • Step 3: Calculate EUR to economic limit for each model
  • Output: Best model selection based on R² and EUR comparison
How to use this blueprint
  1. In Excel, go to the Petroleum Office ribbon tab and click Blueprint Manager
  2. Search for DCA Auto-Fit Model Comparison
  3. Click on the blueprint to preview the spreadsheet template
  4. Click Insert to place it into your worksheet. Modify the input values to match your data.
Tags:
DCAauto-fitArpsDuongmodel-selectionEURR-squareddecline-curve

Need a custom calculation? Request a Blueprint

An unhandled error has occurred. Reload X