Arps Decline Forecast
How long a well pays and how much oil it makes before it stops, by Arps hyperbolic decline to an economic-limit rate.
Decline Curve Analysis 129 rows × 6 columnsMicrosoft 365
Use this blueprint
How to use this blueprint
- In Excel, go to the Petroleum Office ribbon tab and click Blueprint Manager
- Search for Arps Decline Forecast
- Click on the blueprint to preview
- Click Insert to place it into your worksheet. Modify the input values to match your data.
Requires the Petroleum Office add-in for Excel. Needs Microsoft 365 or Excel 2024: it uses a function Excel 2016 doesn't have (LAMBDA), which shows #NAME? there.
Description
How long will the well pay, and how much oil will it make before it stops? You enter an Arps (1945) hyperbolic decline (initial rate, nominal decline and exponent) and an economic-limit rate. You read off the time to the limit, the estimated ultimate recovery (EUR) to it, the secant and tangent effective first-year declines that reserves reports quote, and the cumulative at 10 years as a share of the EUR.
Parameters:
- Decline: the initial oil rate
ARP_qi(STB/d), the initial nominal declineARP_Di(1/yr) and the hyperbolic exponentARP_b(0 exponential, 1 harmonic) - Limit: the economic-limit oil rate
ARP_QEcon(STB/d), the rate below which the well no longer pays its operating cost - Grid: the step unit
ARP_Basis(Monthly or Daily) and the stepARP_Step, months or days per row; the grid has 60 steps - History match: the largest RMSE allowed as a share of the history's mean rate,
ARP_FitMax
How to use it: Compute monthly rates as each month's volume over its days on production, take out shut-in and partial months, fit qi, Di and b to the rates against time on production with the Arps fitter, and set the economic limit from the well's operating cost over its netback per barrel. The forecast is checked against the well's 24-month history by its RMSE: a large miss means the parameters don't describe this well. Check also that b lies between 0 and 1 and that the grid reaches the limit. The forecast grid has 61 rows from time zero, stepped in months or in days by a pick-list; one chart draws the rate on a log scale over the history, the other the cumulative against the EUR.
Method: The sheet computes in months. Rates are STB/d, so a cumulative or an EUR is STB/d·month and the days in a month (365.25/12 = 30.4375) turn it into barrels. Di is typed per year, as it is quoted, and divided by 12. The rate is q = qi/(1 + b·Di·t)^(1/b), exponential qi·exp(−Di·t) at b = 0. The time to the limit is ((qi/qecon)^b − 1)/(b·Di) and the EUR is qi/((1 − b)·Di)·[1 − (qecon/qi)^(1 − b)]. The secant effective decline over the first year is 1 − (1 + b·Di)^(−1/b) with Di per year; the tangent effective decline, 1 − exp(−Di), is the exponential's. The history match is the RMSE between the history's rates and the forecast's at the same months, over the history's mean rate. The grid's step is the step typed, in months, or in days over 30.4375 when the unit is Daily.
Example: The default case is the decline family's reference well, the same on the Arps, modified hyperbolic, Duong and model-comparison sheets: a tight-oil horizontal well whose first 24 months of oil rate fall from 895 to 199 STB/d. Its Arps parameters are the Arps fitter's on that history, rounded: qi = 1,020 STB/d, Di = 1.89/yr (0.1575/month) and b = 0.93. The economic limit is 15 STB/d and the grid runs in 7-month steps to 35 years.
Di = 1.89/12 = 0.1575/month. The secant effective first-year decline is 1 − (1 + 0.93 × 1.89)^(−1/0.93) = 1 − 2.7577^(−1.0753) = 66.4 %/yr, so the rate after a year is 1,020 × 0.336 = 342.7 STB/d; the tangent effective decline is 1 − e^(−1.89) = 84.9 %/yr. The rate reaches 15 STB/d after ((1,020/15)^0.93 − 1)/(0.93 × 0.1575) = 49.62/0.14648 = 338.7 months, 28.2 years. The EUR is 1,020/(0.07 × 0.1575) × [1 − (15/1,020)^0.07] = 92,517 × 0.25573 = 23,660 STB/d·month, × 30.4375 = 720.2 MSTB, of which 555.9 MSTB (77.2 %) comes in the first 10 years. The forecast misses the history by an RMSE of 11.7 STB/d, 2.9 % of its 397.4 STB/d mean. The 35-year grid runs past the 28.2-year limit.
Functions used
PO.DCA.Convert.NominalToEffectiveConverts nominal (continuous) decline rate to effective (periodic) decline rate. De = 1 - exp(-Dn).PO.DCA.Arps.RateCalculates rate using Arps (1945) decline curve, {L3/T}. Units of volume {L3} and time {T} must be consistent. Use b=0 for exponential, 0<b<1 for hyperbolic, b=1 for harmonic.PO.DCA.Arps.TimeTime to reach an economic rate limit for Arps decline, {T}. Returns the time when the production rate falls to the specified economic limit.PO.DCA.Arps.EUREstimated Ultimate Recovery (EUR) to an economic rate limit for Arps decline, {L3}. Returns cumulative production up to the time the rate reaches the economic limit.PO.DCA.Arps.ProdCalculates cumulative production using Arps (1945) decline curve, {L3}. Units of volume {L3} and time {T} must be consistent. Use b=0 for exponential, 0<b<1 for hyperbolic, b=1 for harmonic.PO.Stats.RMSEComputes the root mean squared error (RMSE) between observed and predicted sequences. RMSE = sqrt(SSE/n).
Names it defines (37)
| Name | Refers to | Comment |
|---|---|---|
PO.DCA.Arps.SecantEff |
=LAMBDA(Di, b, IF(OR(Di<0, b<0), NA(), IF(b=0, 1-EXP(-Di), 1-(1+b*Di)^(-1/b)))) |
Secant effective decline (fraction per period) of an Arps hyperbolic: 1 - (1 + b*Di)^(-1/b), or 1 - exp(-Di) for b = 0. Di is the nominal decline per period (1/yr gives the effective annual decline) and b the exponent. |
ARP_qi |
$B$4 |
Initial oil rate, qi, STB/d |
ARP_Di |
$B$5 |
Initial nominal decline, Di, 1/yr |
ARP_b |
$B$6 |
Hyperbolic exponent, b (0 exponential, 1 harmonic) |
ARP_QEcon |
$B$7 |
Economic-limit oil rate, STB/d |
ARP_Basis |
$B$9 |
Unit of the forecast grid's step, Monthly or Daily |
ARP_Step |
$B$10 |
Grid step, months or days per row |
ARP_FitMax |
$B$11 |
Largest history mismatch allowed (RMSE over mean rate), % |
ARP_Inputs |
$B$4:$B$11 |
The Arps qi, Di and b, the economic-limit rate, the grid's step unit and size, and the history mismatch allowed |
ARP_DiM |
$B$14 |
Nominal decline per month, Di/12, 1/month |
ARP_DeSec |
$B$15 |
Secant effective decline, first year, %/yr |
ARP_DeTan |
$B$16 |
Tangent effective decline, 1 − exp(−Di), %/yr |
ARP_q1yr |
$B$17 |
Oil rate after one year, STB/d |
ARP_TLim |
$B$19 |
Time to the economic limit, years |
ARP_EUR |
$B$20 |
EUR to the economic limit, MSTB |
ARP_Np10 |
$B$21 |
Cumulative at 10 years, MSTB |
ARP_Share10 |
$B$22 |
Share of the EUR produced in 10 years, % |
ARP_RMSE |
$B$24 |
RMSE against the history, STB/d |
ARP_RelErr |
$B$25 |
RMSE over the history's mean rate, % |
ARP_StepM |
$B$26 |
Grid step in months, months |
ARP_GridEnd |
$B$27 |
Time at the grid's end, years |
ARP_BCheck |
$B$28 |
Hyperbolic exponent check verdict |
ARP_BCheckNote |
$C$28 |
Hyperbolic exponent check comment |
ARP_FitCheck |
$B$29 |
History match check verdict |
ARP_FitCheckNote |
$C$29 |
History match check comment |
ARP_GridCheck |
$B$30 |
Grid check verdict |
ARP_GridCheckNote |
$C$30 |
Grid check comment |
ARP_Results |
$B$14:$B$30 |
The monthly decline, the secant and tangent effective declines, the rate after a year, the time to the limit, the EUR, the 10-year cumulative and its share, the history RMSE, the grid's step and end, and the three checks |
ARP_History |
$A$36:$D$59 |
The well's first 24 months: the time, the oil rate measured at the end of each month, and each model's rate at that time |
ARP_HistT |
$A$36:$A$59 |
History times, months |
ARP_HistY |
$B$36:$B$59 |
History times, years |
ARP_HistQ |
$C$36:$C$59 |
History oil rates, STB/d |
ARP_HistFit |
$D$36:$D$59 |
Arps at the history times, STB/d |
ARP_Curve |
$A$64:$F$124 |
The forecast grid: time in months and years, the Arps rate, the cumulative, and the EUR and economic limit as reference lines |
ARP_MoYr |
$B$127 |
Months in a year, months/yr |
ARP_DMo |
$B$128 |
Days in a month, 365.25/12, days/month |
ARP_Rows |
$B$129 |
Rows of the forecast grid after the first |
Details
| Inserts | 129 rows × 6 columns |
| Category | Decline Curve Analysis |
| For agents and tools | Descriptor (.md) |
| Tags | decline · Arps · hyperbolic · exponential · harmonic · forecast · production · economic-limit · EUR · secant |
Need a custom calculation? Request a blueprint