---
cid: po.bp.dca.arps.forecast
hub: dca
tags: [decline, Arps, hyperbolic, exponential, harmonic, forecast, production, economic-limit, EUR, secant]
facets: { discipline: production, property: rate, model: arps, method-type: empirical }
title: Arps Decline Forecast
summary: "How long a well pays and how much oil it makes before it stops, by Arps hyperbolic decline to an economic-limit rate."
slug: po.dca.arps.forecast
type: worksheet
---

# Arps Decline Forecast

## Description

How long will the well pay, and how much oil will it make before it stops? You enter an Arps (1945) hyperbolic decline (initial rate, nominal decline and exponent) and an economic-limit rate. You read off the time to the limit, the estimated ultimate recovery (EUR) to it, the secant and tangent effective first-year declines that reserves reports quote, and the cumulative at 10 years as a share of the EUR.

**Parameters:**
- **Decline**: the initial oil rate `ARP_qi` (STB/d), the initial nominal decline `ARP_Di` (1/yr) and the hyperbolic exponent `ARP_b` (0 exponential, 1 harmonic)
- **Limit**: the economic-limit oil rate `ARP_QEcon` (STB/d), the rate below which the well no longer pays its operating cost
- **Grid**: the step unit `ARP_Basis` (Monthly or Daily) and the step `ARP_Step`, months or days per row; the grid has 60 steps
- **History match**: the largest RMSE allowed as a share of the history's mean rate, `ARP_FitMax`

**How to use it:** Compute monthly rates as each month's volume over its days on production, take out shut-in and partial months, fit qi, Di and b to the rates against time on production with the Arps fitter, and set the economic limit from the well's operating cost over its netback per barrel. The forecast is checked against the well's 24-month history by its RMSE: a large miss means the parameters don't describe this well. Check also that b lies between 0 and 1 and that the grid reaches the limit. The forecast grid has 61 rows from time zero, stepped in months or in days by a pick-list; one chart draws the rate on a log scale over the history, the other the cumulative against the EUR.

**Method:** The sheet computes in months. Rates are STB/d, so a cumulative or an EUR is STB/d·month and the days in a month (365.25/12 = 30.4375) turn it into barrels. Di is typed per year, as it is quoted, and divided by 12. The rate is q = qi/(1 + b·Di·t)^(1/b), exponential qi·exp(−Di·t) at b = 0. The time to the limit is ((qi/qecon)^b − 1)/(b·Di) and the EUR is qi/((1 − b)·Di)·[1 − (qecon/qi)^(1 − b)]. The secant effective decline over the first year is 1 − (1 + b·Di)^(−1/b) with Di per year; the tangent effective decline, 1 − exp(−Di), is the exponential's. The history match is the RMSE between the history's rates and the forecast's at the same months, over the history's mean rate. The grid's step is the step typed, in months, or in days over 30.4375 when the unit is Daily.

**Example:** The default case is the decline family's reference well, the same on the Arps, modified hyperbolic, Duong and model-comparison sheets: a tight-oil horizontal well whose first 24 months of oil rate fall from 895 to 199 STB/d. Its Arps parameters are the Arps fitter's on that history, rounded: qi = 1,020 STB/d, Di = 1.89/yr (0.1575/month) and b = 0.93. The economic limit is 15 STB/d and the grid runs in 7-month steps to 35 years.

Di = 1.89/12 = 0.1575/month. The secant effective first-year decline is 1 − (1 + 0.93 × 1.89)^(−1/0.93) = 1 − 2.7577^(−1.0753) = 66.4 %/yr, so the rate after a year is 1,020 × 0.336 = 342.7 STB/d; the tangent effective decline is 1 − e^(−1.89) = 84.9 %/yr. The rate reaches 15 STB/d after ((1,020/15)^0.93 − 1)/(0.93 × 0.1575) = 49.62/0.14648 = 338.7 months, 28.2 years. The EUR is 1,020/(0.07 × 0.1575) × [1 − (15/1,020)^0.07] = 92,517 × 0.25573 = 23,660 STB/d·month, × 30.4375 = 720.2 MSTB, of which 555.9 MSTB (77.2 %) comes in the first 10 years. The forecast misses the history by an RMSE of 11.7 STB/d, 2.9 % of its 397.4 STB/d mean. The 35-year grid runs past the 28.2-year limit.

## Validity

Arps's decline is empirical and holds for a well in boundary-dominated flow at constant flowing pressure, where b lies between 0 and 1 (Fetkovich, 1980). A tight or shale well's early months are transient and fit with b above 1; there the hyperbolic's ultimate is unbounded and the EUR rests on the economic limit alone, which is why the exponent check warns above 1 and SPEE's Monograph 4 caps such forecasts with a terminal decline. Here b = 0.93 is just inside the range. A change in operating conditions (choke, artificial lift, offset interference, a workover) starts a new decline and needs a new fit. The economic limit is a rate, held constant; a price or cost that changes over the life moves it.

Named alternatives: the Modified Hyperbolic Decline sheet for a hyperbolic capped by a terminal decline; the Duong Decline Forecast sheet for a well in long transient linear flow; the Decline Model Comparison sheet to see how far the model choice moves the EUR; the Arps fitter to fit the parameters.

## References

- Arps, J.J. (1945). "Analysis of Decline Curves." *Trans. AIME* 160, 228–247.
- Fetkovich, M.J. (1980). "Decline Curve Analysis Using Type Curves." *JPT* 32(6), 1065–1077 (the 0 to 1 range of b in boundary-dominated flow).
- Ahmed, T. (2019). *Reservoir Engineering Handbook*, 5th ed., Gulf Professional, ch. 16 (decline and type-curve analysis).
- SPEE (2016). *Monograph 4: Estimating Ultimate Recovery of Developed Wells in Low-Permeability Reservoirs*, Society of Petroleum Evaluation Engineers (secant effective declines, b above 1 and terminal declines).

## Functions used

`PO.DCA.Arps.Rate`, `PO.DCA.Arps.Prod`, `PO.DCA.Arps.Time`, `PO.DCA.Arps.EUR`, `PO.DCA.Arps.SecantEff`, `PO.DCA.Convert.NominalToEffective`, `PO.Stats.RMSE`

## Spreadsheet: DcaArpsForecast

|     | A                                                                                                                                                                                                | B                                                                | C                                                                                                                                                                                                                                                                           | D                                                         | E          | F                      |
|-----|--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------|------------------------------------------------------------------|-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------|-----------------------------------------------------------|------------|------------------------|
| 1   | Arps Decline Forecast                                                                                                                                                                            |                                                                  | Petroleum Office                                                                                                                                                                                                                                                            |                                                           |            |                        |
| 2   | Blue cells on yellow are inputs. Type the well's Arps qi, Di and b, its economic-limit rate and the grid's step; the effective declines, the time to the limit, the EUR and the forecast follow. |                                                                  |                                                                                                                                                                                                                                                                             |                                                           |            |                        |
| 3   | Well and Decline                                                                                                                                                                                 |                                                                  |                                                                                                                                                                                                                                                                             |                                                           |            |                        |
| 4   | Initial oil rate, qi                                                                                                                                                                             | 1020                                                             | STB/d                                                                                                                                                                                                                                                                       |                                                           |            |                        |
| 5   | Initial nominal decline, Di                                                                                                                                                                      | 1.89                                                             | 1/yr                                                                                                                                                                                                                                                                        |                                                           |            |                        |
| 6   | Hyperbolic exponent, b (0 exponential, 1 harmonic)                                                                                                                                               | 0.93                                                             | —                                                                                                                                                                                                                                                                           |                                                           |            |                        |
| 7   | Economic-limit oil rate                                                                                                                                                                          | 15                                                               | STB/d                                                                                                                                                                                                                                                                       |                                                           |            |                        |
| 8   | Forecast Grid and History Match                                                                                                                                                                  |                                                                  |                                                                                                                                                                                                                                                                             |                                                           |            |                        |
| 9   | Grid step unit (Monthly or Daily)                                                                                                                                                                | Monthly                                                          | —                                                                                                                                                                                                                                                                           |                                                           |            |                        |
| 10  | Grid step, months or days per row                                                                                                                                                                | 7                                                                | —                                                                                                                                                                                                                                                                           |                                                           |            |                        |
| 11  | Largest history mismatch allowed (RMSE over mean rate)                                                                                                                                           | 0.1                                                              | %                                                                                                                                                                                                                                                                           |                                                           |            |                        |
| 13  | Decline                                                                                                                                                                                          |                                                                  |                                                                                                                                                                                                                                                                             |                                                           |            |                        |
| 14  | Nominal decline per month, Di/12                                                                                                                                                                 | =ARP_Di/ARP_MoYr                                                 | 1/month                                                                                                                                                                                                                                                                     |                                                           |            |                        |
| 15  | Secant effective decline, first year                                                                                                                                                             | =PO.DCA.Arps.SecantEff(ARP_Di,ARP_b)                             | %/yr                                                                                                                                                                                                                                                                        |                                                           |            |                        |
| 16  | Tangent effective decline, 1 − exp(−Di)                                                                                                                                                          | =PO.DCA.Convert.NominalToEffective(ARP_Di)                       | %/yr                                                                                                                                                                                                                                                                        |                                                           |            |                        |
| 17  | Oil rate after one year                                                                                                                                                                          | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,ARP_MoYr)                 | STB/d                                                                                                                                                                                                                                                                       |                                                           |            |                        |
| 18  | Economic Limit and EUR                                                                                                                                                                           |                                                                  |                                                                                                                                                                                                                                                                             |                                                           |            |                        |
| 19  | Time to the economic limit                                                                                                                                                                       | =PO.DCA.Arps.Time(ARP_qi,ARP_DiM,ARP_b,ARP_QEcon)/ARP_MoYr       | years                                                                                                                                                                                                                                                                       |                                                           |            |                        |
| 20  | EUR to the economic limit                                                                                                                                                                        | =PO.DCA.Arps.EUR(ARP_qi,ARP_DiM,ARP_b,ARP_QEcon)*ARP_DMo/1000    | MSTB                                                                                                                                                                                                                                                                        |                                                           |            |                        |
| 21  | Cumulative at 10 years                                                                                                                                                                           | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,10*ARP_MoYr)*ARP_DMo/1000 | MSTB                                                                                                                                                                                                                                                                        |                                                           |            |                        |
| 22  | Share of the EUR produced in 10 years                                                                                                                                                            | =ARP_Np10/ARP_EUR                                                | %                                                                                                                                                                                                                                                                           |                                                           |            |                        |
| 23  | History Match and Grid                                                                                                                                                                           |                                                                  |                                                                                                                                                                                                                                                                             |                                                           |            |                        |
| 24  | RMSE against the history                                                                                                                                                                         | =PO.Stats.RMSE(ARP_HistQ,ARP_HistFit)                            | STB/d                                                                                                                                                                                                                                                                       |                                                           |            |                        |
| 25  | RMSE over the history's mean rate                                                                                                                                                                | =ARP_RMSE/AVERAGE(ARP_HistQ)                                     | %                                                                                                                                                                                                                                                                           |                                                           |            |                        |
| 26  | Grid step in months                                                                                                                                                                              | =ARP_Step*IF(ARP_Basis="Daily",1/ARP_DMo,1)                      | months                                                                                                                                                                                                                                                                      |                                                           |            |                        |
| 27  | Time at the grid's end                                                                                                                                                                           | =ARP_Rows*ARP_StepM/ARP_MoYr                                     | years                                                                                                                                                                                                                                                                       |                                                           |            |                        |
| 28  | Hyperbolic exponent check                                                                                                                                                                        | =IF(ARP_b>1,"WARN","PASS")                                       | =IF(ARP_b>1,"b = "&TEXT(ARP_b,"0.00")&" is above 1, transient flow: the EUR rests on the limit alone; use the modified hyperbolic sheet","b = "&TEXT(ARP_b,"0.00")&" is within Arps's 0 to 1 for boundary-dominated flow")                                                  |                                                           |            |                        |
| 29  | History match check                                                                                                                                                                              | =IF(ARP_RelErr<=ARP_FitMax,"PASS","WARN")                        | =IF(ARP_RelErr<=ARP_FitMax,"Arps misses the history by "&TEXT(ARP_RelErr,"0.0%")&" of its mean rate, within "&TEXT(ARP_FitMax,"0%"),"Arps misses the history by "&TEXT(ARP_RelErr,"0.0%")&" of its mean rate, past "&TEXT(ARP_FitMax,"0%")&": refit it before forecasting") |                                                           |            |                        |
| 30  | Grid check                                                                                                                                                                                       | =IF(ARP_GridEnd>=ARP_TLim,"PASS","WARN")                         | =IF(ARP_GridEnd>=ARP_TLim,"the grid runs to "&TEXT(ARP_GridEnd,"0.0")&" years, past the limit at "&TEXT(ARP_TLim,"0.0")&" years","the grid ends at "&TEXT(ARP_GridEnd,"0.0")&" years, before the limit at "&TEXT(ARP_TLim,"0.0")&": lengthen the step")                     |                                                           |            |                        |
| 32  | The Well's History                                                                                                                                                                               |                                                                  |                                                                                                                                                                                                                                                                             |                                                           |            |                        |
| 33  | The history is synthetic, the reference well's. How to use it: monthly volumes over days on production, with shut-in and partial months taken out, against time on production.                   |                                                                  |                                                                                                                                                                                                                                                                             |                                                           |            |                        |
| 34  | The Arps column is the forecast's rate at each month; the RMSE above is taken between the two.                                                                                                   |                                                                  |                                                                                                                                                                                                                                                                             |                                                           |            |                        |
| 35  | Time (months)                                                                                                                                                                                    | Time (years)                                                     | Oil rate (STB/d)                                                                                                                                                                                                                                                            | Arps (STB/d)                                              |            |                        |
| 36  | 1                                                                                                                                                                                                | =A36/ARP_MoYr                                                    | 895                                                                                                                                                                                                                                                                         | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A36)               |            |                        |
| 37  | 2                                                                                                                                                                                                | =A37/ARP_MoYr                                                    | 751                                                                                                                                                                                                                                                                         | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A37)               |            |                        |
| 38  | 3                                                                                                                                                                                                | =A38/ARP_MoYr                                                    | 713                                                                                                                                                                                                                                                                         | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A38)               |            |                        |
| 39  | 4                                                                                                                                                                                                | =A39/ARP_MoYr                                                    | 600                                                                                                                                                                                                                                                                         | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A39)               |            |                        |
| 40  | 5                                                                                                                                                                                                | =A40/ARP_MoYr                                                    | 569                                                                                                                                                                                                                                                                         | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A40)               |            |                        |
| 41  | 6                                                                                                                                                                                                | =A41/ARP_MoYr                                                    | 528                                                                                                                                                                                                                                                                         | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A41)               |            |                        |
| 42  | 7                                                                                                                                                                                                | =A42/ARP_MoYr                                                    | 458                                                                                                                                                                                                                                                                         | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A42)               |            |                        |
| 43  | 8                                                                                                                                                                                                | =A43/ARP_MoYr                                                    | 456                                                                                                                                                                                                                                                                         | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A43)               |            |                        |
| 44  | 9                                                                                                                                                                                                | =A44/ARP_MoYr                                                    | 409                                                                                                                                                                                                                                                                         | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A44)               |            |                        |
| 45  | 10                                                                                                                                                                                               | =A45/ARP_MoYr                                                    | 395                                                                                                                                                                                                                                                                         | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A45)               |            |                        |
| 46  | 11                                                                                                                                                                                               | =A46/ARP_MoYr                                                    | 353                                                                                                                                                                                                                                                                         | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A46)               |            |                        |
| 47  | 12                                                                                                                                                                                               | =A47/ARP_MoYr                                                    | 357                                                                                                                                                                                                                                                                         | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A47)               |            |                        |
| 48  | 13                                                                                                                                                                                               | =A48/ARP_MoYr                                                    | 318                                                                                                                                                                                                                                                                         | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A48)               |            |                        |
| 49  | 14                                                                                                                                                                                               | =A49/ARP_MoYr                                                    | 311                                                                                                                                                                                                                                                                         | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A49)               |            |                        |
| 50  | 15                                                                                                                                                                                               | =A50/ARP_MoYr                                                    | 301                                                                                                                                                                                                                                                                         | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A50)               |            |                        |
| 51  | 16                                                                                                                                                                                               | =A51/ARP_MoYr                                                    | 267                                                                                                                                                                                                                                                                         | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A51)               |            |                        |
| 52  | 17                                                                                                                                                                                               | =A52/ARP_MoYr                                                    | 271                                                                                                                                                                                                                                                                         | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A52)               |            |                        |
| 53  | 18                                                                                                                                                                                               | =A53/ARP_MoYr                                                    | 252                                                                                                                                                                                                                                                                         | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A53)               |            |                        |
| 54  | 19                                                                                                                                                                                               | =A54/ARP_MoYr                                                    | 251                                                                                                                                                                                                                                                                         | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A54)               |            |                        |
| 55  | 20                                                                                                                                                                                               | =A55/ARP_MoYr                                                    | 227                                                                                                                                                                                                                                                                         | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A55)               |            |                        |
| 56  | 21                                                                                                                                                                                               | =A56/ARP_MoYr                                                    | 227                                                                                                                                                                                                                                                                         | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A56)               |            |                        |
| 57  | 22                                                                                                                                                                                               | =A57/ARP_MoYr                                                    | 212                                                                                                                                                                                                                                                                         | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A57)               |            |                        |
| 58  | 23                                                                                                                                                                                               | =A58/ARP_MoYr                                                    | 217                                                                                                                                                                                                                                                                         | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A58)               |            |                        |
| 59  | 24                                                                                                                                                                                               | =A59/ARP_MoYr                                                    | 199                                                                                                                                                                                                                                                                         | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A59)               |            |                        |
| 62  | Forecast                                                                                                                                                                                         |                                                                  |                                                                                                                                                                                                                                                                             |                                                           |            |                        |
| 63  | Time (months)                                                                                                                                                                                    | Time (years)                                                     | Oil rate (STB/d)                                                                                                                                                                                                                                                            | Cumulative (MSTB)                                         | EUR (MSTB) | Economic limit (STB/d) |
| 64  | =0*ARP_StepM                                                                                                                                                                                     | =A64/ARP_MoYr                                                    | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A64)                                                                                                                                                                                                                                 | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A64)*ARP_DMo/1000  | =ARP_EUR   | =ARP_QEcon             |
| 65  | =1*ARP_StepM                                                                                                                                                                                     | =A65/ARP_MoYr                                                    | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A65)                                                                                                                                                                                                                                 | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A65)*ARP_DMo/1000  | =ARP_EUR   | =ARP_QEcon             |
| 66  | =2*ARP_StepM                                                                                                                                                                                     | =A66/ARP_MoYr                                                    | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A66)                                                                                                                                                                                                                                 | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A66)*ARP_DMo/1000  | =ARP_EUR   | =ARP_QEcon             |
| 67  | =3*ARP_StepM                                                                                                                                                                                     | =A67/ARP_MoYr                                                    | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A67)                                                                                                                                                                                                                                 | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A67)*ARP_DMo/1000  | =ARP_EUR   | =ARP_QEcon             |
| 68  | =4*ARP_StepM                                                                                                                                                                                     | =A68/ARP_MoYr                                                    | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A68)                                                                                                                                                                                                                                 | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A68)*ARP_DMo/1000  | =ARP_EUR   | =ARP_QEcon             |
| 69  | =5*ARP_StepM                                                                                                                                                                                     | =A69/ARP_MoYr                                                    | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A69)                                                                                                                                                                                                                                 | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A69)*ARP_DMo/1000  | =ARP_EUR   | =ARP_QEcon             |
| 70  | =6*ARP_StepM                                                                                                                                                                                     | =A70/ARP_MoYr                                                    | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A70)                                                                                                                                                                                                                                 | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A70)*ARP_DMo/1000  | =ARP_EUR   | =ARP_QEcon             |
| 71  | =7*ARP_StepM                                                                                                                                                                                     | =A71/ARP_MoYr                                                    | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A71)                                                                                                                                                                                                                                 | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A71)*ARP_DMo/1000  | =ARP_EUR   | =ARP_QEcon             |
| 72  | =8*ARP_StepM                                                                                                                                                                                     | =A72/ARP_MoYr                                                    | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A72)                                                                                                                                                                                                                                 | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A72)*ARP_DMo/1000  | =ARP_EUR   | =ARP_QEcon             |
| 73  | =9*ARP_StepM                                                                                                                                                                                     | =A73/ARP_MoYr                                                    | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A73)                                                                                                                                                                                                                                 | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A73)*ARP_DMo/1000  | =ARP_EUR   | =ARP_QEcon             |
| 74  | =10*ARP_StepM                                                                                                                                                                                    | =A74/ARP_MoYr                                                    | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A74)                                                                                                                                                                                                                                 | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A74)*ARP_DMo/1000  | =ARP_EUR   | =ARP_QEcon             |
| 75  | =11*ARP_StepM                                                                                                                                                                                    | =A75/ARP_MoYr                                                    | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A75)                                                                                                                                                                                                                                 | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A75)*ARP_DMo/1000  | =ARP_EUR   | =ARP_QEcon             |
| 76  | =12*ARP_StepM                                                                                                                                                                                    | =A76/ARP_MoYr                                                    | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A76)                                                                                                                                                                                                                                 | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A76)*ARP_DMo/1000  | =ARP_EUR   | =ARP_QEcon             |
| 77  | =13*ARP_StepM                                                                                                                                                                                    | =A77/ARP_MoYr                                                    | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A77)                                                                                                                                                                                                                                 | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A77)*ARP_DMo/1000  | =ARP_EUR   | =ARP_QEcon             |
| 78  | =14*ARP_StepM                                                                                                                                                                                    | =A78/ARP_MoYr                                                    | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A78)                                                                                                                                                                                                                                 | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A78)*ARP_DMo/1000  | =ARP_EUR   | =ARP_QEcon             |
| 79  | =15*ARP_StepM                                                                                                                                                                                    | =A79/ARP_MoYr                                                    | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A79)                                                                                                                                                                                                                                 | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A79)*ARP_DMo/1000  | =ARP_EUR   | =ARP_QEcon             |
| 80  | =16*ARP_StepM                                                                                                                                                                                    | =A80/ARP_MoYr                                                    | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A80)                                                                                                                                                                                                                                 | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A80)*ARP_DMo/1000  | =ARP_EUR   | =ARP_QEcon             |
| 81  | =17*ARP_StepM                                                                                                                                                                                    | =A81/ARP_MoYr                                                    | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A81)                                                                                                                                                                                                                                 | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A81)*ARP_DMo/1000  | =ARP_EUR   | =ARP_QEcon             |
| 82  | =18*ARP_StepM                                                                                                                                                                                    | =A82/ARP_MoYr                                                    | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A82)                                                                                                                                                                                                                                 | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A82)*ARP_DMo/1000  | =ARP_EUR   | =ARP_QEcon             |
| 83  | =19*ARP_StepM                                                                                                                                                                                    | =A83/ARP_MoYr                                                    | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A83)                                                                                                                                                                                                                                 | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A83)*ARP_DMo/1000  | =ARP_EUR   | =ARP_QEcon             |
| 84  | =20*ARP_StepM                                                                                                                                                                                    | =A84/ARP_MoYr                                                    | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A84)                                                                                                                                                                                                                                 | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A84)*ARP_DMo/1000  | =ARP_EUR   | =ARP_QEcon             |
| 85  | =21*ARP_StepM                                                                                                                                                                                    | =A85/ARP_MoYr                                                    | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A85)                                                                                                                                                                                                                                 | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A85)*ARP_DMo/1000  | =ARP_EUR   | =ARP_QEcon             |
| 86  | =22*ARP_StepM                                                                                                                                                                                    | =A86/ARP_MoYr                                                    | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A86)                                                                                                                                                                                                                                 | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A86)*ARP_DMo/1000  | =ARP_EUR   | =ARP_QEcon             |
| 87  | =23*ARP_StepM                                                                                                                                                                                    | =A87/ARP_MoYr                                                    | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A87)                                                                                                                                                                                                                                 | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A87)*ARP_DMo/1000  | =ARP_EUR   | =ARP_QEcon             |
| 88  | =24*ARP_StepM                                                                                                                                                                                    | =A88/ARP_MoYr                                                    | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A88)                                                                                                                                                                                                                                 | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A88)*ARP_DMo/1000  | =ARP_EUR   | =ARP_QEcon             |
| 89  | =25*ARP_StepM                                                                                                                                                                                    | =A89/ARP_MoYr                                                    | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A89)                                                                                                                                                                                                                                 | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A89)*ARP_DMo/1000  | =ARP_EUR   | =ARP_QEcon             |
| 90  | =26*ARP_StepM                                                                                                                                                                                    | =A90/ARP_MoYr                                                    | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A90)                                                                                                                                                                                                                                 | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A90)*ARP_DMo/1000  | =ARP_EUR   | =ARP_QEcon             |
| 91  | =27*ARP_StepM                                                                                                                                                                                    | =A91/ARP_MoYr                                                    | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A91)                                                                                                                                                                                                                                 | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A91)*ARP_DMo/1000  | =ARP_EUR   | =ARP_QEcon             |
| 92  | =28*ARP_StepM                                                                                                                                                                                    | =A92/ARP_MoYr                                                    | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A92)                                                                                                                                                                                                                                 | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A92)*ARP_DMo/1000  | =ARP_EUR   | =ARP_QEcon             |
| 93  | =29*ARP_StepM                                                                                                                                                                                    | =A93/ARP_MoYr                                                    | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A93)                                                                                                                                                                                                                                 | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A93)*ARP_DMo/1000  | =ARP_EUR   | =ARP_QEcon             |
| 94  | =30*ARP_StepM                                                                                                                                                                                    | =A94/ARP_MoYr                                                    | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A94)                                                                                                                                                                                                                                 | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A94)*ARP_DMo/1000  | =ARP_EUR   | =ARP_QEcon             |
| 95  | =31*ARP_StepM                                                                                                                                                                                    | =A95/ARP_MoYr                                                    | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A95)                                                                                                                                                                                                                                 | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A95)*ARP_DMo/1000  | =ARP_EUR   | =ARP_QEcon             |
| 96  | =32*ARP_StepM                                                                                                                                                                                    | =A96/ARP_MoYr                                                    | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A96)                                                                                                                                                                                                                                 | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A96)*ARP_DMo/1000  | =ARP_EUR   | =ARP_QEcon             |
| 97  | =33*ARP_StepM                                                                                                                                                                                    | =A97/ARP_MoYr                                                    | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A97)                                                                                                                                                                                                                                 | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A97)*ARP_DMo/1000  | =ARP_EUR   | =ARP_QEcon             |
| 98  | =34*ARP_StepM                                                                                                                                                                                    | =A98/ARP_MoYr                                                    | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A98)                                                                                                                                                                                                                                 | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A98)*ARP_DMo/1000  | =ARP_EUR   | =ARP_QEcon             |
| 99  | =35*ARP_StepM                                                                                                                                                                                    | =A99/ARP_MoYr                                                    | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A99)                                                                                                                                                                                                                                 | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A99)*ARP_DMo/1000  | =ARP_EUR   | =ARP_QEcon             |
| 100 | =36*ARP_StepM                                                                                                                                                                                    | =A100/ARP_MoYr                                                   | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A100)                                                                                                                                                                                                                                | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A100)*ARP_DMo/1000 | =ARP_EUR   | =ARP_QEcon             |
| 101 | =37*ARP_StepM                                                                                                                                                                                    | =A101/ARP_MoYr                                                   | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A101)                                                                                                                                                                                                                                | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A101)*ARP_DMo/1000 | =ARP_EUR   | =ARP_QEcon             |
| 102 | =38*ARP_StepM                                                                                                                                                                                    | =A102/ARP_MoYr                                                   | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A102)                                                                                                                                                                                                                                | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A102)*ARP_DMo/1000 | =ARP_EUR   | =ARP_QEcon             |
| 103 | =39*ARP_StepM                                                                                                                                                                                    | =A103/ARP_MoYr                                                   | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A103)                                                                                                                                                                                                                                | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A103)*ARP_DMo/1000 | =ARP_EUR   | =ARP_QEcon             |
| 104 | =40*ARP_StepM                                                                                                                                                                                    | =A104/ARP_MoYr                                                   | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A104)                                                                                                                                                                                                                                | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A104)*ARP_DMo/1000 | =ARP_EUR   | =ARP_QEcon             |
| 105 | =41*ARP_StepM                                                                                                                                                                                    | =A105/ARP_MoYr                                                   | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A105)                                                                                                                                                                                                                                | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A105)*ARP_DMo/1000 | =ARP_EUR   | =ARP_QEcon             |
| 106 | =42*ARP_StepM                                                                                                                                                                                    | =A106/ARP_MoYr                                                   | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A106)                                                                                                                                                                                                                                | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A106)*ARP_DMo/1000 | =ARP_EUR   | =ARP_QEcon             |
| 107 | =43*ARP_StepM                                                                                                                                                                                    | =A107/ARP_MoYr                                                   | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A107)                                                                                                                                                                                                                                | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A107)*ARP_DMo/1000 | =ARP_EUR   | =ARP_QEcon             |
| 108 | =44*ARP_StepM                                                                                                                                                                                    | =A108/ARP_MoYr                                                   | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A108)                                                                                                                                                                                                                                | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A108)*ARP_DMo/1000 | =ARP_EUR   | =ARP_QEcon             |
| 109 | =45*ARP_StepM                                                                                                                                                                                    | =A109/ARP_MoYr                                                   | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A109)                                                                                                                                                                                                                                | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A109)*ARP_DMo/1000 | =ARP_EUR   | =ARP_QEcon             |
| 110 | =46*ARP_StepM                                                                                                                                                                                    | =A110/ARP_MoYr                                                   | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A110)                                                                                                                                                                                                                                | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A110)*ARP_DMo/1000 | =ARP_EUR   | =ARP_QEcon             |
| 111 | =47*ARP_StepM                                                                                                                                                                                    | =A111/ARP_MoYr                                                   | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A111)                                                                                                                                                                                                                                | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A111)*ARP_DMo/1000 | =ARP_EUR   | =ARP_QEcon             |
| 112 | =48*ARP_StepM                                                                                                                                                                                    | =A112/ARP_MoYr                                                   | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A112)                                                                                                                                                                                                                                | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A112)*ARP_DMo/1000 | =ARP_EUR   | =ARP_QEcon             |
| 113 | =49*ARP_StepM                                                                                                                                                                                    | =A113/ARP_MoYr                                                   | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A113)                                                                                                                                                                                                                                | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A113)*ARP_DMo/1000 | =ARP_EUR   | =ARP_QEcon             |
| 114 | =50*ARP_StepM                                                                                                                                                                                    | =A114/ARP_MoYr                                                   | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A114)                                                                                                                                                                                                                                | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A114)*ARP_DMo/1000 | =ARP_EUR   | =ARP_QEcon             |
| 115 | =51*ARP_StepM                                                                                                                                                                                    | =A115/ARP_MoYr                                                   | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A115)                                                                                                                                                                                                                                | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A115)*ARP_DMo/1000 | =ARP_EUR   | =ARP_QEcon             |
| 116 | =52*ARP_StepM                                                                                                                                                                                    | =A116/ARP_MoYr                                                   | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A116)                                                                                                                                                                                                                                | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A116)*ARP_DMo/1000 | =ARP_EUR   | =ARP_QEcon             |
| 117 | =53*ARP_StepM                                                                                                                                                                                    | =A117/ARP_MoYr                                                   | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A117)                                                                                                                                                                                                                                | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A117)*ARP_DMo/1000 | =ARP_EUR   | =ARP_QEcon             |
| 118 | =54*ARP_StepM                                                                                                                                                                                    | =A118/ARP_MoYr                                                   | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A118)                                                                                                                                                                                                                                | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A118)*ARP_DMo/1000 | =ARP_EUR   | =ARP_QEcon             |
| 119 | =55*ARP_StepM                                                                                                                                                                                    | =A119/ARP_MoYr                                                   | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A119)                                                                                                                                                                                                                                | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A119)*ARP_DMo/1000 | =ARP_EUR   | =ARP_QEcon             |
| 120 | =56*ARP_StepM                                                                                                                                                                                    | =A120/ARP_MoYr                                                   | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A120)                                                                                                                                                                                                                                | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A120)*ARP_DMo/1000 | =ARP_EUR   | =ARP_QEcon             |
| 121 | =57*ARP_StepM                                                                                                                                                                                    | =A121/ARP_MoYr                                                   | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A121)                                                                                                                                                                                                                                | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A121)*ARP_DMo/1000 | =ARP_EUR   | =ARP_QEcon             |
| 122 | =58*ARP_StepM                                                                                                                                                                                    | =A122/ARP_MoYr                                                   | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A122)                                                                                                                                                                                                                                | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A122)*ARP_DMo/1000 | =ARP_EUR   | =ARP_QEcon             |
| 123 | =59*ARP_StepM                                                                                                                                                                                    | =A123/ARP_MoYr                                                   | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A123)                                                                                                                                                                                                                                | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A123)*ARP_DMo/1000 | =ARP_EUR   | =ARP_QEcon             |
| 124 | =60*ARP_StepM                                                                                                                                                                                    | =A124/ARP_MoYr                                                   | =PO.DCA.Arps.Rate(ARP_qi,ARP_DiM,ARP_b,A124)                                                                                                                                                                                                                                | =PO.DCA.Arps.Prod(ARP_qi,ARP_DiM,ARP_b,A124)*ARP_DMo/1000 | =ARP_EUR   | =ARP_QEcon             |
| 126 | Calculation Constants                                                                                                                                                                            |                                                                  |                                                                                                                                                                                                                                                                             |                                                           |            |                        |
| 127 | Months in a year                                                                                                                                                                                 | 12                                                               | months/yr                                                                                                                                                                                                                                                                   |                                                           |            |                        |
| 128 | Days in a month, 365.25/12                                                                                                                                                                       | 30.4375                                                          | days/month                                                                                                                                                                                                                                                                  |                                                           |            |                        |
| 129 | Rows of the forecast grid after the first                                                                                                                                                        | 60                                                               | —                                                                                                                                                                                                                                                                           |                                                           |            |                        |

## Lambdas

| Name | RefersTo | Comment |
|------|----------|---------|
| PO.DCA.Arps.SecantEff | =LAMBDA(Di, b, IF(OR(Di<0, b<0), NA(), IF(b=0, 1-EXP(-Di), 1-(1+b*Di)^(-1/b)))) | Secant effective decline (fraction per period) of an Arps hyperbolic: 1 - (1 + b*Di)^(-1/b), or 1 - exp(-Di) for b = 0. Di is the nominal decline per period (1/yr gives the effective annual decline) and b the exponent. |

## Names

| Name | RefersTo | Comment |
|------|----------|---------|
| ARP_qi | $B$4 | Initial oil rate, qi, STB/d |
| ARP_Di | $B$5 | Initial nominal decline, Di, 1/yr |
| ARP_b | $B$6 | Hyperbolic exponent, b (0 exponential, 1 harmonic) |
| ARP_QEcon | $B$7 | Economic-limit oil rate, STB/d |
| ARP_Basis | $B$9 | Unit of the forecast grid's step, Monthly or Daily |
| ARP_Step | $B$10 | Grid step, months or days per row |
| ARP_FitMax | $B$11 | Largest history mismatch allowed (RMSE over mean rate), % |
| ARP_Inputs | $B$4:$B$11 | The Arps qi, Di and b, the economic-limit rate, the grid's step unit and size, and the history mismatch allowed |
| ARP_DiM | $B$14 | Nominal decline per month, Di/12, 1/month |
| ARP_DeSec | $B$15 | Secant effective decline, first year, %/yr |
| ARP_DeTan | $B$16 | Tangent effective decline, 1 − exp(−Di), %/yr |
| ARP_q1yr | $B$17 | Oil rate after one year, STB/d |
| ARP_TLim | $B$19 | Time to the economic limit, years |
| ARP_EUR | $B$20 | EUR to the economic limit, MSTB |
| ARP_Np10 | $B$21 | Cumulative at 10 years, MSTB |
| ARP_Share10 | $B$22 | Share of the EUR produced in 10 years, % |
| ARP_RMSE | $B$24 | RMSE against the history, STB/d |
| ARP_RelErr | $B$25 | RMSE over the history's mean rate, % |
| ARP_StepM | $B$26 | Grid step in months, months |
| ARP_GridEnd | $B$27 | Time at the grid's end, years |
| ARP_BCheck | $B$28 | Hyperbolic exponent check verdict |
| ARP_BCheckNote | $C$28 | Hyperbolic exponent check comment |
| ARP_FitCheck | $B$29 | History match check verdict |
| ARP_FitCheckNote | $C$29 | History match check comment |
| ARP_GridCheck | $B$30 | Grid check verdict |
| ARP_GridCheckNote | $C$30 | Grid check comment |
| ARP_Results | $B$14:$B$30 | The monthly decline, the secant and tangent effective declines, the rate after a year, the time to the limit, the EUR, the 10-year cumulative and its share, the history RMSE, the grid's step and end, and the three checks |
| ARP_History | $A$36:$D$59 | The well's first 24 months: the time, the oil rate measured at the end of each month, and each model's rate at that time |
| ARP_HistT | $A$36:$A$59 | History times, months |
| ARP_HistY | $B$36:$B$59 | History times, years |
| ARP_HistQ | $C$36:$C$59 | History oil rates, STB/d |
| ARP_HistFit | $D$36:$D$59 | Arps at the history times, STB/d |
| ARP_Curve | $A$64:$F$124 | The forecast grid: time in months and years, the Arps rate, the cumulative, and the EUR and economic limit as reference lines |
| ARP_MoYr | $B$127 | Months in a year, months/yr |
| ARP_DMo | $B$128 | Days in a month, 365.25/12, days/month |
| ARP_Rows | $B$129 | Rows of the forecast grid after the first |

---

## Related Blueprints
- [Decline Model Auto-Fit](/blueprint/po.dca.autofit.compare.md)
- [Production Data Cleaning](/blueprint/po.dca.data.cleaning.md)
- [Decline Model Comparison](/blueprint/po.dca.models.compare.md)
- [Modified Hyperbolic Decline](/blueprint/po.dca.modhyp.forecast.md)
- [Type Well Curves](/blueprint/po.dca.type.well.md)
- [Arps EUR Sensitivity](/blueprint/po.dca.eur.sensitivity.md)

