Slurry volumes for a casing job, the displacement that bumps the plug, and the balanced cement plug that abandons a zone.
3 lambdas
PO.DE.Cement.Volume
Slurry volume of one cement stage (a lead or a tail): the open-hole annulus with an excess, the overlap inside the previous casing, and the shoe track. Call it once per slurry; a lead usually has no shoe track, a tail no overlap. Returns four cells, all bbl: the total, then the open-hole, overlap and shoe-track parts.
PO.DE.Cement.Displacement
The volume of displacement fluid that takes the top plug from surface to the float collar, and the pump strokes to bump it. Returns two cells: the volume, ID²/1029.4 × FC + Extra bbl, then the strokes, the volume over the pump output.
PO.WI.PA.BalancedPlug
Placement of a balanced cement plug through an open-ended string: the spacer to pump behind the cement so the columns inside and outside the pipe balance, the plug height with the pipe in, its height after the pipe is pulled, and the displacement. Returns four cells: spacer behind (bbl), plug height with the pipe in (ft), plug height after pulling out (ft), displacement (bbl).