Underground Withdrawal Calculation


Spreadsheet

27 rows x 3 columns

fx
A B C
1 Underground Withdrawal Calculation
2 Oil Reservoir F Term
3 Np (oil production) 5.2 MMSTB
4 Rp (producing GOR) 1200 scf/STB
5 Rs (solution GOR) 600 scf/STB
6 Bo (oil FVF) 1.32 RB/STB
7 Bg (gas FVF) 0.00125 RB/scf
8 Wp (water production) 1.5 MMSTB
9 Bw (water FVF) 1.02 RB/STB
10
11 F Oil Reservoir 12294000 RB
12 F in MMRB 12.294 MMRB
13
14 Component Breakdown
15 Oil at reservoir (Np*Bo) 6.864 MMRB
16 Free gas ((Rp-Rs)*Np*Bg) 3.9 MMRB
17 Water produced (Wp*Bw) 1.53 MMRB
18 Total F 12.294 MMRB
19
20 Gas Reservoir F Term
21 Gp (gas production) 25 Bscf
22 Bg (gas FVF) 0.00142 RB/scf
23 Wp (water production) 0.5 MMSTB
24 Bw (water FVF) 1.02 RB/STB
25
26 F Gas Reservoir 36010000 RB
27 F in MMRB 36.01 MMRB

Description

Calculate underground withdrawal (F term) for material balance analysis. F represents total reservoir voidage from oil, gas, and water production.

F Term Components:

  • Oil production converted to reservoir conditions
  • Free gas production at reservoir conditions
  • Water production at reservoir conditions
How to use this blueprint
  1. In Excel, go to the Petroleum Office ribbon tab and click Blueprint Manager
  2. Search for Underground Withdrawal Calculation
  3. Click on the blueprint to preview the spreadsheet template
  4. Click Insert to place it into your worksheet. Modify the input values to match your data.
Tags:
MBEwithdrawalvoidageF-termproduction

Need a custom calculation? Request a Blueprint

An unhandled error has occurred. Reload X