Productivity Index by Flow Regime

Compares transient, pseudosteady and steady-state productivity indices and shows when the well's PI settles.

Inflow Performance Relationship 64 rows × 6 columns

Use this blueprint

How to use this blueprint
  1. In Excel, go to the Petroleum Office ribbon tab and click Blueprint Manager
  2. Search for Productivity Index by Flow Regime
  3. Click on the blueprint to preview
  4. Click Insert to place it into your worksheet. Modify the input values to match your data.

Requires the Petroleum Office add-in for Excel.

Get Petroleum Office

Description

Which productivity index applies to the well now, and when does it settle? You enter one rock, fluid and well description (permeability, pay, oil FVF and viscosity, porosity, total compressibility, radii and skin), the reservoir and flowing pressures, and a producing time. You read off the PI in transient, pseudosteady-state and steady-state flow, the time the well takes to reach pseudosteady state, the regime at the producing time, and the PI and rate that apply then.

A new well's PI falls with time while the pressure disturbance spreads out (transient, infinite-acting flow), and settles once the disturbance reaches the drainage boundary. If the boundary is closed, the well is then in pseudosteady state (PSS) and its pressure falls uniformly. If an aquifer or a gas cap holds the boundary's pressure, it is in steady state (SS). A table and a chart draw the PI against producing time from 1 hr to 10,000 hr on a log axis. Three checks read the regime at the producing time, how well the transient and PSS PIs meet at the switch, and how much the boundary type matters.

Parameters:

  • Well: permeability IFR_k (mD), net pay IFR_h (ft), oil FVF IFR_Bo (rb/STB) and viscosity IFR_Uo (cp), porosity IFR_phi and total compressibility IFR_ct (1/psi), drainage and wellbore radii IFR_re and IFR_rw (ft), and skin IFR_s
  • Pressures and time: the reservoir pressure IFR_Pr (psi; the initial pressure for the transient PI, the average for the PSS PI and the boundary's for the SS PI), the flowing pressure IFR_Pwf (psi, above Pb), and the producing time to read the PI at IFR_t (hr)
  • Check limit: the largest PI difference accepted between two regimes, IFR_Tol

How to use it: Take k·h and the skin from a buildup, φ from the logs, and ct = co·So + cw·Sw + cf from the PVT report and a rock-compressibility correlation or core. Take re from the well spacing, and the producing time from the well's history since it last shut in: a buildup or a long shut-in resets the clock.

Method: The transient PI of a well in an infinite-acting reservoir is J = k·h/(162.6·Bo·μo·(log(k·t/(φ·μo·ct·rw²)) − 3.23 + 0.87·s)), with t in hours, on the initial pressure. The pseudosteady-state PI is J = k·h/(141.2·Bo·μo·(ln(re/rw) − 0.75 + s)), on the average pressure. The steady-state PI is J = k·h/(141.2·Bo·μo·(ln(re/rw) − 0.5 + s)), on the boundary pressure. The time to pseudosteady state is when the dimensionless time on the drainage area reaches 0.1 for a well at the centre of a circle, tDA = 0.0002637·k·t/(φ·μo·ct·π·re²), so tpss = 1,191·φ·μo·ct·re²/k hours. Before tpss the transient PI applies; after it the PSS PI applies if the boundary is closed, or the SS PI if it is held. Each regime's rate at the flowing pressure is its PI times its drawdown.

Example: The default case is the oil-inflow family's reference well, the one the Composite Oil IPR, Fetkovich Oil IPR Fitted to a Multi-Rate Test, Klins-Clark Oil IPR, Productivity Index and Flow Efficiency, and Skin Sensitivity of the IPR sheets start from: a vertical oil well on 160 acres (re = 1,490 ft, rw = 0.354 ft) in 50 ft of 20 mD sand, producing the reference black oil (Ahmed's oil 2, Pb = 2,620 psi, Bo = 1.467 rb/STB and μo = 0.302 cp at 4,000 psi) from a 4,000 psi reservoir, with a total skin of 5 from a buildup. The sand has a porosity of 20 % and a total compressibility of 1.5 × 10⁻⁵ 1/psi, and the PI is read after 30 days (720 hr) on production at 3,000 psi flowing.

With φ = 0.2, μo = 0.302 cp and ct = 1.5 × 10⁻⁵ 1/psi, the well feels its 1,490 ft boundary after tpss = 119.7 hr, 5.0 days. At 720 hr it is past that, so the PSS PI of 1.269 STB/d/psi applies, 1,269 STB/d at 3,000 psi. Read as if the reservoir were still infinite, the transient PI would have fallen to 1.136, 10.5 % below. At tpss itself the transient PI is 1.213, 4.4 % below the PSS PI: the two meet to within the 10 % accepted. The steady-state PI, 1.198, is 5.6 % below the PSS PI, because it is measured against the boundary pressure rather than the lower average pressure. In the table the transient PI starts at 1.482 after one hour and crosses the PSS PI between 20 and 50 hr.

Functions used

Names it defines (38)
NameRefers toComment
IFR_k $B$4 Formation permeability, k, mD
IFR_h $B$5 Net pay, h, ft
IFR_Bo $B$6 Oil formation volume factor, Bo, bbl/STB
IFR_Uo $B$7 Oil viscosity, μo, cp
IFR_phi $B$8 Porosity, φ, %
IFR_ct $B$9 Total compressibility, ct, 1/psi
IFR_re $B$10 Drainage radius, re, ft
IFR_rw $B$11 Wellbore radius, rw, ft
IFR_s $B$12 Skin, s
IFR_Pr $B$13 Reservoir pressure (initial, for the transient PI), Pr, psi
IFR_Pwf $B$14 Flowing bottomhole pressure (above Pb), psi
IFR_t $B$15 Producing time to read the PI at, hr
IFR_Tol $B$17 Largest PI difference accepted between two regimes, %
IFR_Inputs $B$4:$B$17 The rock, oil and well, the porosity and compressibility, the reservoir and flowing pressures, the producing time, and the check limit
IFR_tpss $B$20 Time to pseudosteady state, t_pss, hr
IFR_tpssD $B$21 The same in days, days
IFR_Regime $B$22 Regime at the producing time
IFR_JTF $B$24 Transient PI at the producing time, STB/d/psi
IFR_JPSS $B$25 Pseudosteady-state PI, closed boundary, STB/d/psi
IFR_JSS $B$26 Steady-state PI, constant-pressure boundary, STB/d/psi
IFR_JSwitch $B$27 Transient PI at t_pss, STB/d/psi
IFR_J $B$28 PI that applies at the producing time (closed boundary), STB/d/psi
IFR_TFErr $B$29 Transient PI against the PSS PI, %
IFR_SwitchErr $B$30 Transient PI at t_pss against the PSS PI, %
IFR_SSErr $B$31 Steady-state PI against the PSS PI, %
IFR_qTF $B$33 Transient rate, STB/d
IFR_qPSS $B$34 Pseudosteady-state rate, STB/d
IFR_qSS $B$35 Steady-state rate, STB/d
IFR_q $B$36 Rate that applies at the producing time, STB/d
IFR_RegimeCheck $B$37 Regime check verdict
IFR_RegimeCheckNote $C$37 Regime check comment
IFR_SwitchCheck $B$38 Switch check verdict
IFR_SwitchCheckNote $C$38 Switch check comment
IFR_BoundaryCheck $B$39 Boundary check verdict
IFR_BoundaryCheckNote $C$39 Boundary check comment
IFR_Results $B$20:$B$39 t_pss in hours and days, the regime at the producing time, the PI in each regime and at the switch, the PI and rate that apply, the differences, and the three checks
IFR_Curve $A$49:$F$61 Producing time from 1 to 10,000 hr, the transient, PSS and SS PI, the transient PI over the PSS one, and the transient rate at the flowing pressure
IFR_HrDay $B$64 Hours in a day, hr/day

Details

Inserts64 rows × 6 columns
CategoryInflow Performance Relationship
For agents and toolsDescriptor (.md)
TagsIPR · flow-regime · transient · pseudosteady-state · steady-state · productivity-index · Darcy

Need a custom calculation? Request a blueprint