Production Back-Allocation

Overview

Most wells are not metered continuously. Their production is commingled at a battery, platform or processing facility, and only the total is measured, at the sales (fiscal) meters and the facility's gas and water meters. Each well is measured only occasionally, by a well test through a test separator. Back-allocation divides the measured total among the wells, period by period, using those tests.

The allocated volumes are the production history of every well. They are the data that decline analysis, type curves, material balance and history matching are built on, and the basis of royalty and partner accounting. An allocation error therefore becomes a forecasting error: a well credited with another well's oil shows a decline it never had.

Well testsrate, GOR, water cutProducing hoursdowntime logMeasured totalsbattery or fiscal metersTheoretical volumeper well and phaseAllocation factorper phaseAllocated volumeper well and phaseProduction historyDCA, type wells, MBE

Theoretical Volumes

The theoretical (or estimated) volume of a well over the period is what it would have produced at its test rates for the hours it was on:

Vo,ith=qo,itest⋅Hi24V_{o,i}^{th} = q_{o,i}^{test} \cdot \frac{H_i}{24}

Vg,ith=Vo,ith⋅GORitest1000,Vw,ith=Vo,ith⋅fw,itest1−fw,itestV_{g,i}^{th} = V_{o,i}^{th} \cdot \frac{GOR_i^{test}}{1000}, \qquad V_{w,i}^{th} = V_{o,i}^{th} \cdot \frac{f_{w,i}^{test}}{1 - f_{w,i}^{test}}

Where:

  • qo,itestq_{o,i}^{test} = test oil rate of well ii (STB/d)
  • HiH_i = hours on production in the period
  • GORitestGOR_i^{test} = test gas-oil ratio (scf/STB), so VgV_g is in Mscf
  • fw,itestf_{w,i}^{test} = test water cut (fraction of the liquid)

The hours come from the downtime record, not the calendar: a well shut in for a workover or a facility trip produces nothing for those hours. The facility uptime is ∑Hi/(N⋅24⋅days)\sum H_i / (N \cdot 24 \cdot \text{days}).


The Allocation Factor

For each phase the allocation factor (proration factor) is the measured total over the sum of the theoretical volumes:

Fp=Vpmeas∑i=1NVp,ith,p∈{o,g,w}F_p = \frac{V_p^{meas}}{\sum_{i=1}^{N} V_{p,i}^{th}}, \qquad p \in \{o, g, w\}

and each well is allocated its theoretical volume scaled by that factor:

Vp,ialloc=Fp⋅Vp,ithV_{p,i}^{alloc} = F_p \cdot V_{p,i}^{th}

By construction the allocated volumes add up to the meter, ∑iVp,ialloc=Vpmeas\sum_i V_{p,i}^{alloc} = V_p^{meas}. This pro-rata allocation by test is the method described in API MPMS Chapter 20.1 for allocating a measured total among sources by test or theoretical rates.

What the Factor Measures

A factor of exactly 1 means the tests, the hours and the meter agree. Any departure is the sum of every error between them:

Source Effect on the factor
Stale tests on declining wells Tests overstate the current rate, so the oil factor falls below 1
Test-separator to stock-tank shrinkage Test oil measured at separator conditions shrinks before the sales meter, so the oil factor falls below 1 and released gas raises the gas factor
Unmetered fuel, flare and lease use Gas measured downstream of the use lowers the gas factor, unless the volumes are added back
Tank inventory change Oil produced into or drawn from storage shifts the oil factor up or down for the period
Meter bias Moves the factor in proportion to the bias
Wells tested at different choke or line pressure Test rate is not the rate the well produced at

A factor far from 1 (operators commonly investigate outside about ±5-10 %) says that something is wrong. It does not say which well. The factor spreads the whole discrepancy over all wells in proportion to their theoretical volume, so the largest producers absorb the largest share of an error that may belong to a single small well.

Phase Factors and Allocated Ratios

Each phase is allocated against its own meter, so a well's allocated GOR and water cut are not its test values:

GORialloc=GORitest⋅FgFo,WORialloc=WORitest⋅FwFoGOR_i^{alloc} = GOR_i^{test} \cdot \frac{F_g}{F_o}, \qquad WOR_i^{alloc} = WOR_i^{test} \cdot \frac{F_w}{F_o}

Every well's ratios move by the same factor ratio. When the GOR or water-cut history of a well is used for diagnosis (gas coning, water breakthrough), read the test values as well as the allocated ones.


Good Practice

  1. Test regularly. Test frequency should follow the rate of change: new wells, wells near breakthrough and wells after a workover need more frequent tests than stable wells.
  2. Use a valid test. A test should be stabilised and taken at the choke and line pressure the well produced at during the period.
  3. Correct the meters first. Add back fuel, flare and lease use, correct for tank inventory, and convert to stock-tank conditions before computing factors, so the factor reflects only what remains unexplained.
  4. Track the factor over time. A stable factor near 1 is evidence that the allocation can be trusted; a drifting one points to a meter or a group of stale tests.
  5. Retest the wells that matter. When the factor fails, retest the largest producers and the wells whose rate has changed most since their last test.

Alternatives to Test-Based Allocation

Method Basis When used
Pro-rata by test Test rates times hours Standard for wells on a common battery
Model-based (theoretical rates) Each well's rate computed from its measured wellhead or bottomhole pressure through its inflow and tubing model Wells with pressure gauges but infrequent tests; allocation between test dates
Individual well metering A meter on every well, including multiphase meters High-value or subsea wells, fields with many owners
Reconciliation Measurement uncertainty of each meter used to weight the adjustment Commingled fields with several owners and fiscal meters

Model-based allocation uses the same nodal analysis as well design: the rate at which the IPR and the tubing performance cross at the measured pressure. It follows a well's decline between tests, but it is only as good as the models' calibration to the last test.


In Petroleum Office

The Production Back-Allocation by Well Test and Uptime blueprint and the Production Allocation workbook allocate a battery's metered oil, gas and water to its wells from each well's test oil rate, GOR, water cut and hours on. They report each phase's factor against warning and failure bands, each well's allocated volumes and share, the uptime, and checks that each phase closes to its meter. The allocated history then feeds the decline functions (PO.DCA.Arps.Rate and related) and the field profile functions PO.FPP.Sched.Rate and PO.FPP.Sched.Prod.



References

  1. American Petroleum Institute. Manual of Petroleum Measurement Standards, Chapter 20.1, "Allocation Measurement." API.

  2. American Petroleum Institute. Manual of Petroleum Measurement Standards, Chapter 20.3, "Measurement of Multiphase Flow." API.

  3. Economides, M.J., Hill, A.D., Ehlig-Economides, C., and Zhu, D. (2013). Petroleum Production Systems, 2nd Edition. Prentice Hall.

  4. Arps, J.J. (1945). "Analysis of Decline Curves." Transactions of AIME, 160, 228-247.

Tags: back-allocation · allocation · allocation-factor · well-test · uptime · production-accounting · battery · multi-well