PO.RP.Load.MPRL.Mills


Description

Calculates Minimum Polished Rod Load with the approximate (Mills) acceleration factor, MPRL = Wr·(1 − F2) − SG·62.4·Wr/490 (Guo Section 12.4.2), [lbf].

Syntax

=PO.RP.Load.MPRL.Mills(Wr, SG, F2)

Parameters

Parameter Description
Wr Rod string weight in air, [lbf].
SG Specific gravity of the fluid in the tubing (water = 1), [dimensionless].
F2 Downstroke acceleration factor F2, from PO.RP.Load.F2.Mills, [dimensionless].

Missing a formula? Suggest a New Formula