PO.SIM.DECK.BUILD


Description

Builds a long-form Deck from input tables: spec, grid, PVT, SCAL, wells and schedule. Spills the Deck the PO.SIM.OPM functions run.

Syntax

=PO.SIM.DECK.BUILD(spec, grid, pvt, scal, wells, schedule)

Parameters

Parameter Description
spec Spec table: 'key' and 'value' columns. PHASES picks the family: single-phase, oil water or oil water gas; TITLE names the run.
grid Grid table: i, j, k, property and value columns, a row per cell and property; or poro, permx, permy and permz columns, one row for every cell or one per cell with i, j and k.
pvt Pvt table (oil water gas only): kind, pressure, rs, bo, muo, bg and mug columns.
scal Scal table (oil water gas only): saturation, krw, krow, krg and krog columns.
wells Wells table: name, type, i, j, k1 and k2 columns.
schedule Schedule table: day, well, control, target and limit columns, a row per control from its day on; control = report on the days a report step ends.

Missing a formula? Suggest a New Formula