Number of sacks of tail cement required for casing

Input(s)

Lc\mathrm{L}_{\mathrm{c}}: Distance between Float Collar and Shoe (ft)(\mathrm{ft})

Cc\mathrm{C}_{\mathrm{c}}: Casing Capacity (ft3/ft)\left(\mathrm{ft}^{3} / \mathrm{ft}\right)

Y: Slurry Yield of Tail Cement (ft3/\left(\mathrm{ft}^{3} /\right. stroke ))

Output(s)

Ns\mathrm{N}_{\mathrm{s}}: Sacks Required by Casing (unitless)

Formula(s)

Ns=LcCcY\mathrm{N}_{\mathrm{s}}=\frac{\mathrm{L}_{\mathrm{c}} * \mathrm{C}_{\mathrm{c}}}{\mathrm{Y}}

Reference(s)

Lapeyrouse, N. J., 2002, Formulas and Calculations for Drilling, Production and Workover, Second Edition, Gulf Professional Publishing, Page: 56.


Related

An unhandled error has occurred. Reload 🗙