Number of sacks of cement required for a given length of plug

Input(s)

\(\mathrm{L}_{\mathrm{p}}\): Plug Length (ft)

\(\mathrm{C}_{\mathrm{c}}\): Casing Capacity \(\left(\mathrm{ft}^{3} / \mathrm{ft}\right)\)

E: Excess Volume (fraction)

Y: Slurry Yield \(\left(\mathrm{ft}^{3} /\right.\) stroke \()\)

Output(s)

\(\mathrm{N}_{\mathrm{s}}\): Sacks of Cement Required (unitless)

Formula(s)

\[ \mathrm{N}_{\mathrm{s}}=\frac{\mathrm{L}_{\mathrm{p}} * \mathrm{C}_{\mathrm{c}} * \mathrm{E}}{\mathrm{Y}} \]

Reference(s)

Lapeyrouse, N. J., 2002, Formulas and Calculations for Drilling, Production and Workover, Second Edition, Gulf Professional Publishing, Page: 61.


Related

An unhandled error has occurred. Reload 🗙