Number of sacks of cement required for a given length of plug

Input(s)

Lp\mathrm{L}_{\mathrm{p}}: Plug Length (ft)

Cc\mathrm{C}_{\mathrm{c}}: Casing Capacity (ft3/ft)\left(\mathrm{ft}^{3} / \mathrm{ft}\right)

E: Excess Volume (fraction)

Y: Slurry Yield (ft3/\left(\mathrm{ft}^{3} /\right. stroke ))

Output(s)

Ns\mathrm{N}_{\mathrm{s}}: Sacks of Cement Required (unitless)

Formula(s)

Ns=LpCcEY\mathrm{N}_{\mathrm{s}}=\frac{\mathrm{L}_{\mathrm{p}} * \mathrm{C}_{\mathrm{c}} * \mathrm{E}}{\mathrm{Y}}

Reference(s)

Lapeyrouse, N. J., 2002, Formulas and Calculations for Drilling, Production and Workover, Second Edition, Gulf Professional Publishing, Page: 61.


Related

An unhandled error has occurred. Reload 🗙