Number of sacks of cement required for a given length of plug
Input(s)
: Plug Length (ft)
: Casing Capacity
E: Excess Volume (fraction)
Y: Slurry Yield stroke
Output(s)
: Sacks of Cement Required (unitless)
Formula(s)
Reference(s)
Lapeyrouse, N. J., 2002, Formulas and Calculations for Drilling, Production and Workover, Second Edition, Gulf Professional Publishing, Page: 61.