Amount of cement to be left in casing

Input(s)

Lc\mathrm{L}_{\mathrm{c}}: Casing Length (ft)(\mathrm{ft})

D: Setting Depth of Cementing Tool (ft)

Cc\mathrm{C}_{\mathrm{c}}: Casing Capacity (ft3/ft)\left(\mathrm{ft}^{3} / \mathrm{ft}\right)

Output(s)

AC: Amount of Cement (ft3)\left(\mathrm{ft}^{3}\right)

Formula(s)

AC=(LcD)Cc\mathrm{AC}=\left(\mathrm{L}_{\mathrm{c}}-\mathrm{D}\right) * \mathrm{C}_{\mathrm{c}}

Reference(s)

Lapeyrouse, N. J., 2002, Formulas and Calculations for Drilling, Production and Workover, Second Edition, Gulf Professional Publishing, Page: 58.


Related

An unhandled error has occurred. Reload 🗙