Height of cement in the annulus

Input(s)

\(\mathrm{V}_{\mathrm{s}}\): Slurry Volume \(\left(\mathrm{ft}^{3}\right)\)

\(\mathrm{C}_{\mathrm{c}}\): Casing Capacity \(\left(\mathrm{ft}^{3} / \mathrm{ft}\right)\)

AC: Cement Remaining in Casing \(\left(\mathrm{ft}^{3}\right)\)

E: Excess Volume (fraction)

Output(s)

H: Height of Cement in Annulus (ft)

Formula(s)

\[ \mathrm{H}=\frac{\mathrm{V}_{\mathrm{s}}-\mathrm{AC}+\mathrm{C}_{\mathrm{c}}}{\mathrm{E}} \]

Reference(s)

Lapeyrouse, N. J., 2002, Formulas and Calculations for Drilling, Production and Workover, Second Edition, Gulf Professional Publishing, Page: 58.


Related

An unhandled error has occurred. Reload 🗙