Volume of cuttings generated per foot of hole drilled
Input(s)
: Hole Size (in.)
Ø: Porosity (fraction)
Output(s)
: Volume of Cuttings (bbl/ft)
Formula(s)
Reference(s)
Formulas and Calculations for Drilling, Production and Workover (2nd Edition), Page: 18.