Cost per foot of coring

Input(s)

\(\mathrm{C}_{\mathrm{b}}\): Core Bit Cost \((\$)\)

C: Rig Cost ($)

\(\mathrm{T}_{\mathrm{d}}\): Total Coring Time (h)

\(\mathrm{T}_{\mathrm{t}}\): Trip Time (h)

\(\mathrm{T}_{\mathrm{r}}\): Core Recovery Time (h)

F: Footage Cored (ft)

\(\mathrm{R}_{\mathrm{c}}\): Core Recovery Percentage (fraction)

Output(s)

C: Cost per Foot of Coring \((\$ / f t)\)

Formula(s)

\[ \mathrm{C}=\frac{\mathrm{C}_{\mathrm{b}}+\mathrm{C}_{\mathrm{r}} *\left(\mathrm{~T}_{\mathrm{d}}+\mathrm{T}_{\mathrm{t}}+\mathrm{T}_{\mathrm{r}}\right)}{\mathrm{F} * \mathrm{R}_{\mathrm{c}}} \]

Reference(s)

Samuel. E Robello. 501 Solved Problems and Calculations for Drilling Operations. Sigma Quadrant. 2015. Houston, Texas, Page: 469.


Related

An unhandled error has occurred. Reload 🗙