Slowness of the formation
Input(s)
: Borehole Diameter (in.)
: Interval Travel Time
: Tool Diameter (in.)
: Spacing of the Tool (ft)
: Eccentricity of the Tool (ft)
: Time Between Initiation of the Pulse and First Arrival Acoustic Energy at the Receiver ( )
Output(s)
: Slowness of Formation Observed by Sonic Log
: Mud Path Correction Time
Formula(s)
Reference(s)
Bassiouni, Z., 1994, Theory, Measurement, and Interpretation of Well Logs. SPE Textbook Series Vol. 4. Chapter 10, Page: 189.