Kick analysis - Formation pressure with well shut-in on a kick
Input(s)
SIDPP: Maximum allowable shut in casing pressure (psi)
mw: Mud weight (ppg)
h: Height (ft)
Output(s)
: Kick Analysis (Formation Pressure with well shut in on a kick) (psi)
Formula(s)
Reference(s)
Formulas and Calculations for Drilling, Production and Workover, Second Edition, Lapeyrouse, Page: 125.