Initial volume required to achieve a volume with barite
Input(s)
: Initial Mud wt. (ppg)
: Required mud wt. (ppg)
: Final Volume (ppg)
Output(s)
: Starting Volume (bbl)
Formula(s)
Reference(s)
Formulas and Calculations for Drilling, Production and Workover, Second Edition, Lapeyrouse, Page: 82.