Increase volume by barite

Input(s)

W1W_{1}: Initial Mud wt. (ppg)

W2W_{2}: Required mud wt. (ppg)

Output(s)

V: Volume increase per 100bbl(bbl/100bbl)100 \mathrm{bbl}(\mathrm{bbl} / 100 \mathrm{bbl})

Formula(s)

V=100W2W135W2V=100 * \frac{W_{2}-W_{1}}{35-W_{2}}

Reference(s)

Formulas and Calculations for Drilling, Production and Workover, Second Edition, Lapeyrouse, Page: 82.


Related

An unhandled error has occurred. Reload 🗙