Increase mud density by barite

Input(s)

\(W_{1}\): Initial Mud wt. (ppg)

\(W_{2}\): Required mud wt (ppg)

Output(s)

B: Sacks of barite required per \(100 \mathrm{bbl}\) (stroke/100bbl)

Formula(s)

\[ B=1470 * \frac{W_{2}-W_{1}}{35-W_{2}} \]

Reference(s)

Formulas and Calculations for Drilling, Production and Workover, Second Edition, Lapeyrouse, Page: 81.


Related

An unhandled error has occurred. Reload 🗙