Well shut-in pressure during buildup (Horner plot)
Input(s)
: Initial False Pressure (psi)
: Stabilized Well Flow Rate before Shut-in (STB/day)
: Oil Formation Volume Factor (bbl/STB)
: Permeability
: Oil Viscosity
: Flowing Time before Shut-in (h)
: Shut-in Time (h)
h: Thickness (ft)
Output(s)
: Shut-in Pressure (psi)
Formula(s)
Reference(s)
Ahmed, T., McKinney, P.D. 2005. Advanced Reservoir Engineering, Gulf Publishing of Elsevier, Chapter: 1, Page: 56.