Water quantity that dilutes the original brine with assumed density (two-salt systems)

Input(s)

VdV_{d}: Volume of Diluted Brine (bbl)

ρi\rho_{i}: Density of initial, undiluted Brine (lbm/bbl)(\mathrm{lbm} / \mathrm{bbl})

ρd\rho_{d}: Density of Diluted Brine (lbm/bbl)(\mathrm{lbm} / \mathrm{bbl})

ρ8.33\rho_{8.33} : Density of Water diluting the Original Brine (lbm/bbl)(\mathrm{lbm} / \mathrm{bbl})

Output(s)

V8.33V_{8.33}: Volume of Water Diluting the Original Brine (bbl)

Formula(s)

V8.33=(Vd)(ρiρd)(ρiρ8.33)V_{8.33}=\left(V_{d}\right) \frac{\left(\rho_{i}-\rho_{d}\right)}{\left(\rho_{i}-\rho_{8.33}\right)}

Reference(s)

Bridges, K. L. (2000). Completion and Workover Fluids (Vol. 19). Society of Petroleum Engineers, Page: 56.

An unhandled error has occurred. Reload 🗙