Time to reach the semi-steady state for a gas well in a circular or square drainage area (1)

Input(s)

\(\mu_{\mathrm{gi}}\): Initial Gas Viscosity (cP)

\(\emptyset\): Porosity (fraction)

\(\mathrm{c}_{\mathrm{ti}}\): Initial Total Compressibility (1/psi)

A: Drainage Area \(\left(\mathrm{ft}^{2}\right)\)

\(\mathrm{k}\): Effective Gas Permeability \((\mathrm{mD})\)

Output(s)

\(\mathrm{t}_{\mathrm{pss}}\): Time (h)

Formula(s)

\[ \mathrm{t}_{\mathrm{pss}}=\frac{15.8 * \emptyset * \mu_{\mathrm{gi}} * \mathrm{c}_{\mathrm{ti}} * \mathrm{~A}}{\mathrm{k}} \]

Reference(s)

Ahmed, T., McKinney, P.D. 2005. Advanced Reservoir Engineering, Gulf Publishing of Elsevier, Chapter: 3, Page: 194.


Related

An unhandled error has occurred. Reload 🗙