Shut-in time for pressure build-up test (Dietz method)
Input(s)
: Porosity (fraction)
A: Drainage Area
: Shape Factor (dimensionless)
: Viscosity
: Total Compressibility
k: Permeability
Output(s)
: Shut-in Time (h)
Formula(s)
Reference(s)
Ahmed, T., McKinney, P.D. 2005. Advanced Reservoir Engineering, Gulf Publishing of Elsevier, Chapter: 1, Page: 63.