Productivity index (for generating composite IPR curve)
Input(s)
q: Tested Flow Rate STB/D)
: Bubble Point Pressure
: Wellbore Pressure (psi)
P: Reservoir Pressure (psi)
Output(s)
: Productivity Index
Formula(s)
Reference(s)
Boyun, G., William, C., & Ali Ghalambor, G. (2007). Petroleum Production Engineering: A Computer-Assisted Approach, Page: .