Productivity index (for generating composite IPR curve)

Input(s)

q: Tested Flow Rate (( STB/D)

PbP_{b}: Bubble Point Pressure (psi)(\mathrm{psi})

PwP_{w}: Wellbore Pressure (psi)

P: Reservoir Pressure (psi)

Output(s)

JiJ_{i} : Productivity Index (STB/D/psi)(\mathrm{STB} / \mathrm{D} / \mathrm{psi})

Formula(s)

Ji=q(PPb)+(Pb1.8)(10.2(PwP)0.8(PwP)2)J_{i}=\frac{q}{\left(P-P_{b}\right)+\left(\frac{P_{b}}{1.8}\right)\left(1-0.2 *\left(\frac{P_{w}}{P}\right)-0.8 *\left(\frac{P_{w}}{P}\right)^{2}\right)}

Reference(s)

Boyun, G., William, C., & Ali Ghalambor, G. (2007). Petroleum Production Engineering: A Computer-Assisted Approach, Page: 3/383 / 38.

An unhandled error has occurred. Reload 🗙