Pressure buildup equation (Horner equation)
Input(s)
: Initial Reservoir Pressure (psi)
: Stabilized Well Flow Rate before Shut-in (bbl/d)
: Oil Viscosity
: Oil Formation Volume Factor (rb/stb)
: Permeability
: Height (ft)
: Flowing Time before Shut-in (day)
: Shut-in Time (day)
Output(s)
: Pressure (psi)
Formula(s)
Reference(s)
Ahmed, T., McKinney, P.D. 2005. Advanced Reservoir Engineering, Gulf Publishing of Elsevier, Chapter: 1, Page: 54 .