Kick analysis - Shut-in drill pipe pressure

Input(s)

PfpP_{f p}: Formation Pressure (psi)

mw: Mud weight (ppg)

h\mathrm{h}: height (ft)(\mathrm{ft})

Output(s)

SIDPP: Shut in Drill Pipe Pressure (psi)

Formula(s)

SIDPP=Pfp(mw0.052h)S I D P P=P_{f p}-(m w * 0.052 * h)

Reference(s)

Formulas and Calculations for Drilling, Production and Workover, Second Edition, Lapeyrouse, Page: 131.


Related

An unhandled error has occurred. Reload 🗙