Drilling cost per foot

Input(s)

B: Bit Cost \((\$)\)

\(\mathrm{C}_{\mathrm{R}}\): Rig Cost ($)

\(\mathrm{T}\): Rotating Time (spm)

\(\mathrm{t}\): Round Trip Time (spm)

\(\mathrm{F}: \mathrm{F} \quad\) ootage per \(\mathrm{Bit}(\mathrm{ft})\)

Output(s)

\(\mathrm{C}_{\mathrm{T}}\) :Drilling Cost ($)

Formula(s)

\[ \mathrm{C}_{\mathrm{T}}=\frac{\mathrm{B}+\mathrm{C}_{\mathrm{R}} *(\mathrm{t}+\mathrm{T})}{\mathrm{F}} \]

Reference(s)

Lapeyrouse, N. J., 2002, Formulas and Calculations for Drilling, Production and Workover, Second Edition, Gulf Professional Publishing, Page: 28.

An unhandled error has occurred. Reload 🗙