Calculations required for spotting pills

Input(s)

hd: Diameter of Hole (in.)

pd: Diameter of Drill Pipe (in.)

cd: Diameter of Drill Collar (in.)

Ls\mathrm{L}_{\mathrm{s}}: Length of Section (ft)(\mathrm{ft})

Le\mathrm{L}_{\mathrm{e}}: Length Above the Collar (ft)

WF: Washout Factor (fraction)

Vds\mathrm{V}_{\mathrm{ds}}: Volume Left in Drill String (bbl)

Cdc\mathrm{C}_{\mathrm{dc}}: Drill Collar Capacity (bbl/ft)

Cdp\mathrm{C}_{\mathrm{dp}}: Drill Pipe Capacity (bbl/ft)

L: Length ( ft\mathrm{ft} )

PO: Pump Output (bbl/stroke)

Sds\mathrm{S}_{\mathrm{ds}}: Strokes of Drill Pipe (fraction)

Output(s)

ACdc\mathrm{AC}_{\mathrm{dc}}: Annular Capacity of Drill Collar (bbl/ft)

ACdp\mathrm{AC}_{\mathrm{dp}}: Annular Capacity of Drill Pipe (bbl/ft)

Vdc\mathrm{V}_{\mathrm{dc}}: Volume in Drill Collar (bbl)

Vdp\mathrm{V}_{\mathrm{dp}}: Volume in Drill Pipe (bbl)

Va\mathrm{V}_{\mathrm{a}}: Volume of Pill Required in Annulus (bbl)

Vts\mathrm{V}_{\mathrm{ts}}: Total Volume of Pill Required (bbl)

Ct\mathrm{C}_{\mathrm{t}}: Total Capacity of Drill String (bbl)

Spp\mathrm{S}_{\mathrm{pp}}: Strokes for Pump Pill (no.)

Vcp\mathrm{V}_{\mathrm{cp}}: Volume Req for Chase Pill (bbl)

Scp\mathrm{S}_{\mathrm{cp}}: Strokes for Chase Pill (no.)

St\mathrm{S}_{\mathrm{t}}: Total Strokes to Spot the Pill (no.)

Formula(s)

ACdc=(hd)2(cd)21029.4ACdp=(hd)2(pd)21029.4 Vdc=ACdc LsWFVdp=ACdp LeWFVa=Vdc+VdpVts=Va+VdsCt=(Cdc) Ls+(Cdp) L Spp=VtsPOVcp=CtVdsScp=(VcpPO)+SdsSt=(Spp)+(Scp)\begin{gathered} \mathrm{AC}_{\mathrm{dc}}=\frac{(\mathrm{hd})^{2}-(\mathrm{cd})^{2}}{1029.4} \\ \mathrm{AC}_{\mathrm{dp}}=\frac{(\mathrm{hd})^{2}-(\mathrm{pd})^{2}}{1029.4} \\ \mathrm{~V}_{\mathrm{dc}}=\mathrm{AC}_{\mathrm{dc}} * \mathrm{~L}_{\mathrm{s}} * \mathrm{WF} \\ \mathrm{V}_{\mathrm{dp}}=\mathrm{AC}_{\mathrm{dp}} * \mathrm{~L}_{\mathrm{e}} * \mathrm{WF} \\ \mathrm{V}_{\mathrm{a}}=\mathrm{V}_{\mathrm{dc}}+\mathrm{V}_{\mathrm{dp}} \\ \mathrm{V}_{\mathrm{ts}}=\mathrm{V}_{\mathrm{a}}+\mathrm{V}_{\mathrm{ds}} \\ \mathrm{C}_{\mathrm{t}}=\left(\mathrm{C}_{\mathrm{dc}}\right) * \mathrm{~L}_{\mathrm{s}}+\left(\mathrm{C}_{\mathrm{dp}}\right) * \mathrm{~L} \\ \mathrm{~S}_{\mathrm{pp}}=\frac{\mathrm{V}_{\mathrm{ts}}}{\mathrm{PO}} \\ \mathrm{V}_{\mathrm{cp}}=\mathrm{C}_{\mathrm{t}}-\mathrm{V}_{\mathrm{ds}} \\ \mathrm{S}_{\mathrm{cp}}=\left(\frac{\mathrm{V}_{\mathrm{cp}}}{\mathrm{PO}}\right)+\mathrm{S}_{\mathrm{ds}} \\ \mathrm{S}_{\mathrm{t}}=\left(\mathrm{S}_{\mathrm{pp}}\right)+\left(\mathrm{S}_{\mathrm{cp}}\right) \end{gathered}

Reference(s)

Lapeyrouse, N. J., 2002, Formulas and Calculations for Drilling, Production and Workover, Second Edition, Gulf Professional Publishin, Page: 75.