---
id: po.wb.vfp.vfp-tables
title: VFP Production and Injection Tables
summary: "What bottomhole pressure one vertical well needs across rate, pressure, water cut and GOR, written as VFPPROD and VFPINJ tables for a simulator."
category: Production
requires:
  - po-addin
  - excel-365
tags:
  - VFP
  - multiphase-flow
  - correlation-matching
  - simulator-tables
  - eclipse
  - water-injection
---

## Description

What bottomhole pressure does this well need at each rate, tubing-head pressure, water cut and gas-oil ratio, written as a table a reservoir simulator reads? You enter one vertical well's completion and fluid, a gauge test, and the axes of each table. You read off the tubing correlation that best matches the gauge, a FIELD-unit VFPPROD table for the producer and a VFPINJ table for a water injector in the same tubing, ready to copy into the simulator deck.

**How to use it:** Enter the completion, the fluid and a stabilized gauge test on the Correlations sheet, compare the nine production correlations against the gauge and choose one. Type ascending axes on the VFPPROD sheet (5 liquid rates, 4 tubing-head pressures, 3 water cuts and 4 producing gas-oil ratios) and on the VFPINJ sheet (5 water rates and 4 surface pressures, with the injection water, the fracture gradient and the limits). Review every check on the Summary, then copy each keyword column from the keyword through its last slash; an invalid axis withholds the text.

**Method:** The production BHP is the inlet pressure the chosen correlation gives from the outlet THP. Water cut is water over liquid, and the gas rate is the GOR times the oil rate. The liquid density is the volume-weighted stock-tank oil and water density. The injection BHP is the outlet pressure from the surface inlet pressure, flowing down at -90 degrees; friction and hydrostatic pressure use the single-phase liquid equations. The largest surface injection pressure comes from the fracture gradient at the perforations, the water's hydrostatic gradient, the friction and a safety margin, and the water velocity is compared with API RP 14E's erosional velocity, C over the square root of the density.

**Example:** The vertical-lift reference well reaches 8,500 ft in 2.992-in tubing and produces 3,000 STB/d of liquid against 200 psi at the wellhead, with 768 scf/STB GOR and 20% water cut. Beggs-Brill gives approximately 2,032.84 psi at the bottom, against a 2,056 psi gauge. A separate water injector in the same tubing injects 5,000 bbl/d at 1,500 psi surface pressure; its bottomhole pressure is approximately 5,099.37 psi. The spread between the correlations is wide enough to review against the gauge.

## Validity

The production model holds liquid density and viscosity fixed, treats all gas as free and uses stock-tank volumes, not a compositional or black-oil PVT traverse. All nine correlations are used here for a vertical well; choose with a representative stabilized test and gauge. The injection model is incompressible single-phase water with a fixed viscosity; the fracture gradient and margin must come from the actual interval. THP is at the surface; BHP and the table datum are at the perforation TVD. Replace the synthetic axes and check the simulator and its unit system before use. FIELD rate is STB/d, pressure psi, depth ft, and GOR scf/STB. Artificial lift is a single zero-valued axis, not a gas-lift model. Pressures are rounded to two decimals in the keyword text; review that against the project's precision needs.

## References

- [OPM VFPPROD keyword schema](https://raw.githubusercontent.com/OPM/opm-common/master/opm/input/eclipse/share/keywords/000_Eclipse100/V/VFPPROD).
- [OPM VFPINJ keyword schema](https://raw.githubusercontent.com/OPM/opm-common/master/opm/input/eclipse/share/keywords/000_Eclipse100/V/VFPINJ).
- Beggs, H.D. and Brill, J.P. (1973). A Study of Two-Phase Flow in Inclined Pipes. *JPT* 25(5), 607-617.
- Hagedorn, A.R. and Brown, K.E. (1965). Experimental Study of Pressure Gradients Occurring During Continuous Two-Phase Flow in Small-Diameter Vertical Conduits. *JPT* 17(4), 475-484.
- Brill, J.P. and Mukherjee, H. (1999). *Multiphase Flow in Wells*. SPE Monograph Vol. 17.
- API RP 14E (1991). *Design and Installation of Offshore Production Platform Piping Systems*, 5th ed. American Petroleum Institute.

## Inputs

| Input | Unit | Default | Name |
|---|---|---|---|
| Depth of the perforations, tubing to them (TVD) | ft | 8500 | `VTC_TVD` |
| Tubing inner diameter | in | 2.992 | `VTC_ID` |
| Tubing relative roughness, ε/D | — | 0.0006 | `VTC_Rough` |
| Flowing wellhead pressure | psi | 200 | `VTC_Pwh` |
| Flowing wellhead temperature | F | 120 | `VTC_Twh` |
| Temperature at the perforations | F | 220 | `VTC_Tbh` |
| Stock-tank oil gravity | API | 40.7 | `VTC_API` |
| Gas specific gravity | — | 0.855 | `VTC_SGg` |
| Water specific gravity | — | 1.03 | `VTC_SGw` |
| Producing gas-oil ratio | scf/STB | 768 | `VTC_GOR` |
| Water-oil ratio | bbl/STB | 0.25 | `VTC_WOR` |
| Liquid viscosity in the tubing | cp | 0.6 | `VTC_UL` |
| Gas-liquid surface tension | dyne/cm | 25 | `VTC_IFT` |
| Test liquid rate | STB/d | 3000 | `VTC_QL` |
| Gauge pressure | psi | 2056 | `VTC_Pmeas` |
| Maximum match miss | fraction | see the Correlations sheet | `VTC_MatchTol` |
| Maximum spread / median | fraction | see the Correlations sheet | `VTC_SpreadTol` |
| Selected correlation (from a list) | — | Beggs & Brill (1973) | `VTC_Selected` |
| Rate 1 to Rate 5, ascending | STB/d | 1000-5000 | `VTP_Rate1` to `VTP_Rate5` |
| THP 1 to THP 4, ascending | psi | 100-600 | `VTP_Thp1` to `VTP_Thp4` |
| Water cut 1 to Water cut 3, ascending | fraction | 0-0.4 | `VTP_Wc1` to `VTP_Wc3` |
| GOR 1 to GOR 4, ascending | scf/STB | 400-1000 | `VTP_Gor1` to `VTP_Gor4` |
| Table number (production) | integer | 1 | `VTP_Table` |
| Water viscosity | cp | 0.5 | `VTI_UW` |
| Reference injection rate | bbl/d | 5000 | `VTI_Q` |
| Reference surface pressure | psi | 1500 | `VTI_Ps` |
| Fracture gradient | psi/ft | 0.72 | `VTI_FG` |
| Fracture safety margin | psi | 200 | `VTI_Margin` |
| Erosional C factor | — | 100 | `VTI_C` |
| Maximum erosional velocity share | fraction | 1 | `VTI_VeMax` |
| Injection rate 1 to 5, ascending | bbl/d | 1000-9000 | `VTI_Rate1` to `VTI_Rate5` |
| Injection THP 1 to 4, ascending | psi | 500-2000 | `VTI_Thp1` to `VTI_Thp4` |
| Table number (injection) | integer | 1 | `VTI_Table` |

## Sheets

- `Guide` — the workflow, the pressure datum (THP at the surface, BHP at the perforations) and the model's limits.
- `Correlations` — the well, fluid and gauge test, the nine production correlations' bottomhole pressures and misses against the gauge, their spread, the best match and the correlation chosen for the production table.
- `VFPPROD` — the four production axes, 5 liquid rates by 4 tubing-head pressures by 3 water cuts by 4 producing gas-oil ratios, the VFPPROD keyword text to copy, and a chart of the reference slice against liquid rate.
- `VFPINJ` — the injection water, limits and axes, 5 water rates by 4 surface pressures, the reference injection BHP, the fracture-limited surface pressure and the erosional-velocity ratio, the VFPINJ keyword text, and a chart of the reference slice against water rate.
- `Summary` — the chosen correlation, the reference pressures and every check under one verdict.
- `Test Cases` — the worked example and other cases, with expected and computed results.

## Functions used

`PO.VFP.BeggsBrill.Pin`, `PO.VFP.HagedornBrown.Pin`, `PO.VFP.Ansari.Pin`, `PO.VFP.HasanKabir.Pin`, `PO.VFP.MukherjeeBrill.Pin`, `PO.VFP.Orkiszewski.Pin`, `PO.VFP.DunsRos.Pin`, `PO.VFP.Aziz.Pin`, `PO.VFP.PoettmannCarpenter.Pin`, `PO.VFP.Corr.Match`, `PO.VFP.Liq.Pout`, `PO.VFP.Liq.dPgrv`, `PO.VFP.Liq.dPfrc`, `PO.PE.Inj.FracPressure`, `PO.FA.Erosion.Ve`, `PO.PVT.SG.Oil.FromAPI`, `PO.PVT.Rho.Wat.Stn`.
