---
cid: po.bp.fpp.sched.aggregation
hub: fpp
tags: [schedule, multi-well, aggregation, drilling, field, forecast, type-well, facility, well-count]
facets: { discipline: production, property: production-forecast }
title: Field Rate from a Drilling Schedule and a Type Well
summary: "What rate a field peaks at, and when, as the rigs bring type wells online, against the facility's capacity."
slug: po.fpp.sched.aggregation
type: worksheet
---

# Field Rate from a Drilling Schedule and a Type Well

## Description

What rate will the field peak at as the rigs bring wells online, and when? You enter the type well's Arps decline, the rigs drilling, the days a rig takes for a well, the wells to drill and the facility's capacity. You read off the peak field rate and the month it comes in, the peak against the facility, the rate and cumulative at the ten-year horizon, and the cumulative per well against the type well's own.

**Parameters:**
- **Type well**: its initial oil rate `FSA_qi` (STB/d), initial nominal decline `FSA_Di` (1/yr) and hyperbolic exponent `FSA_b`
- **Rig schedule**: the rigs drilling `FSA_Rigs`, the days a rig takes for one well `FSA_DaysWell`, and the wells to drill `FSA_Wells`
- **Facility**: the facility oil capacity `FSA_Cap` (STB/d), which the peak is checked against

**How to use it:** Take the rigs and the days a well from the rig contract and the offset wells' spud-to-release times, add the completion and hook-up time to the days a well, and fit the type well to the offset wells' monthly rates normalised to time on production with the Arps fitter. For a schedule that isn't a steady rig pace, type the wells starting each month over the grid's schedule column. The sheet turns the rig schedule into the wells coming online each month, takes the type well's average rate in each month of its life, and adds every well's rate at its own age to give the field rate and the cumulative over a ten-year monthly grid. One chart draws the field rate against the facility capacity with the wells online on a second axis; the other draws the cumulative. Two checks judge whether the schedule fits in the horizon and whether the peak fits in the facility.

**Method:** The sheet computes in months with rates in STB/d, so a cumulative is STB/d·month and the days in a month (365.25/12 = 30.4375) turn it into barrels; Di is typed per year and divided by 12. The drilling pace is rigs × 30.4375/days a well, in wells a month. A well finished in a month comes online at the start of the next, so the wells online at month i are min(wells, int(pace × i)) and the wells starting in month i are the difference from the month before. The type well's rate in its month j on production is its Arps cumulative over that month, [Np(j + 1) − Np(j)]/1 month, its average rather than its rate at the month's start. The field rate in month i is the convolution Σ starts(i − j) × profile(j) over j = 0 to i, and the cumulative is the trapezoidal sum of the field rates over the grid. The last well's month is the count of months before all the wells are online; the peak is the largest field rate and its month the first that reaches it.

**Example:** The default case is the field-profile family's reference development, the same on this sheet and on the Field Production Profile with Facility and Well Limits sheet: 24 producers of the decline family's tight-oil type well (qi 1,020 STB/d, Di 1.89/yr, b 0.93, the Arps Decline Forecast sheet's well), drilled by two rigs at 40 days a well into a 12,500 STB/d facility. The type-well decline is the same on both sheets.

Two rigs at 40 days a well drill 2 × 30.4375/40 = 1.522 wells a month, so the 24 wells take 15.8 months and the last comes online in month 16. The type well averages 947.0 STB/d in its first month and 825.0 STB/d in its second, so the field makes 947.0 STB/d in month 1 (one well) and 2 × 947.0 + 825.0 = 2,719.0 STB/d in month 2 (two new wells and the first in its second month). The field peaks at 12,236.8 STB/d in month 16, when the last well comes online, 97.9 % of the 12,500 STB/d facility, so the facility takes it. After that no well is added and the field declines to 1,138.0 STB/d at month 120. The cumulative to month 120 is 13,066.9 MSTB, 544.5 MSTB a well against the type well's 555.9 MSTB over its own first 120 months: the later wells have had less time to produce. The schedule ends in month 16, inside the 120-month horizon.

## Validity

The convolution assumes every well is the type well, starting when it comes online and declining on its own, independent of the others: it holds for a development whose wells don't interfere (wide spacing, or a type well fitted to wells drilled at the planned spacing) and whose facility doesn't choke them back. It does not cap the rate at the facility; the facility check warns when the peak passes it, and the Field Production Profile with Facility and Well Limits sheet models the plateau a capped facility holds. The grid is monthly and ten years long; the wells online are whole wells, so a fractional pace drills in steps, and a well comes online a whole month at a time. The type-well profile is an Arps hyperbolic; for a well better described by Duong or a terminal decline, put that model's monthly average in the profile column.

Named alternatives: the Field Production Profile with Facility and Well Limits sheet, a buildup-plateau-decline abstraction of the same field with the plateau set by the facility; the Arps Decline Forecast sheet for the type well; the Decline Model Comparison sheet to choose the type well's model; a reservoir simulation where wells interfere.

## References

- Arps, J.J. (1945). "Analysis of Decline Curves." *Trans. AIME* 160, 228–247.
- SPEE (2016). *Monograph 4: Estimating Ultimate Recovery of Developed Wells in Low-Permeability Reservoirs*, Society of Petroleum Evaluation Engineers (type wells and their use in development schedules).
- Jahn, F., Cook, M. and Graham, M. (2008). *Hydrocarbon Exploration and Production*, 2nd ed., Elsevier, ch. 13 (production profiles built from a drilling schedule).
- Mian, M.A. (2011). *Project Economics and Decision Analysis*, Vol. 1, 2nd ed., PennWell (multi-well production schedules).

## Functions used

`PO.FPP.Sched.Rate`, `PO.FPP.Sched.Prod`, `PO.DCA.Arps.Prod`

## Spreadsheet: FppSchedAggregation

|     | A                                                                                                                                                                                                | B                                                                                  | C                                                                                                                                                                                                                                                                                                                                                                                                                                                     | D                                                                                                            | E                                                   | F                                                                |
|-----|--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------|------------------------------------------------------------------------------------|-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------|--------------------------------------------------------------------------------------------------------------|-----------------------------------------------------|------------------------------------------------------------------|
| 1   | Field Rate from a Drilling Schedule and a Type Well                                                                                                                                              |                                                                                    | Petroleum Office                                                                                                                                                                                                                                                                                                                                                                                                                                      |                                                                                                              |                                                     |                                                                  |
| 2   | Blue cells on yellow are inputs. Type the type well's decline, the rigs, the days a well, the wells to drill and the facility; the schedule, the field rate, its peak and the cumulative follow. |                                                                                    |                                                                                                                                                                                                                                                                                                                                                                                                                                                       |                                                                                                              |                                                     |                                                                  |
| 3   | Type Well                                                                                                                                                                                        |                                                                                    |                                                                                                                                                                                                                                                                                                                                                                                                                                                       |                                                                                                              |                                                     |                                                                  |
| 4   | Type-well initial oil rate, qi                                                                                                                                                                   | 1020                                                                               | STB/d                                                                                                                                                                                                                                                                                                                                                                                                                                                 |                                                                                                              |                                                     |                                                                  |
| 5   | Type-well initial nominal decline, Di                                                                                                                                                            | 1.89                                                                               | 1/yr                                                                                                                                                                                                                                                                                                                                                                                                                                                  |                                                                                                              |                                                     |                                                                  |
| 6   | Type-well hyperbolic exponent, b                                                                                                                                                                 | 0.93                                                                               | —                                                                                                                                                                                                                                                                                                                                                                                                                                                     |                                                                                                              |                                                     |                                                                  |
| 7   | Rigs, Wells and Facility                                                                                                                                                                         |                                                                                    |                                                                                                                                                                                                                                                                                                                                                                                                                                                       |                                                                                                              |                                                     |                                                                  |
| 8   | Rigs drilling                                                                                                                                                                                    | 2                                                                                  | rigs                                                                                                                                                                                                                                                                                                                                                                                                                                                  |                                                                                                              |                                                     |                                                                  |
| 9   | Days a rig takes for one well                                                                                                                                                                    | 40                                                                                 | days                                                                                                                                                                                                                                                                                                                                                                                                                                                  |                                                                                                              |                                                     |                                                                  |
| 10  | Wells to drill                                                                                                                                                                                   | 24                                                                                 | wells                                                                                                                                                                                                                                                                                                                                                                                                                                                 |                                                                                                              |                                                     |                                                                  |
| 11  | Facility oil capacity                                                                                                                                                                            | 12500                                                                              | STB/d                                                                                                                                                                                                                                                                                                                                                                                                                                                 |                                                                                                              |                                                     |                                                                  |
| 13  | Drilling Schedule                                                                                                                                                                                |                                                                                    |                                                                                                                                                                                                                                                                                                                                                                                                                                                       |                                                                                                              |                                                     |                                                                  |
| 14  | Nominal decline per month, Di/12                                                                                                                                                                 | =FSA_Di/FSA_MoYr                                                                   | 1/month                                                                                                                                                                                                                                                                                                                                                                                                                                               |                                                                                                              |                                                     |                                                                  |
| 15  | Drilling pace, rigs × days in a month / days a well                                                                                                                                              | =FSA_Rigs*FSA_DMo/FSA_DaysWell                                                     | wells/month                                                                                                                                                                                                                                                                                                                                                                                                                                           |                                                                                                              |                                                     |                                                                  |
| 16  | Drilling time, wells / pace                                                                                                                                                                      | =FSA_Wells/FSA_Pace                                                                | months                                                                                                                                                                                                                                                                                                                                                                                                                                                |                                                                                                              |                                                     |                                                                  |
| 17  | Month the last well comes online                                                                                                                                                                 | =COUNTIF(FSA_Online,"<"&FSA_Wells)*FSA_Step                                        | months                                                                                                                                                                                                                                                                                                                                                                                                                                                |                                                                                                              |                                                     |                                                                  |
| 18  | Horizon, the grid's last month                                                                                                                                                                   | =FSA_Rows*FSA_Step                                                                 | months                                                                                                                                                                                                                                                                                                                                                                                                                                                |                                                                                                              |                                                     |                                                                  |
| 19  | Field Rate                                                                                                                                                                                       |                                                                                    |                                                                                                                                                                                                                                                                                                                                                                                                                                                       |                                                                                                              |                                                     |                                                                  |
| 20  | Peak field rate                                                                                                                                                                                  | =MAX(FSA_Rate)                                                                     | STB/d                                                                                                                                                                                                                                                                                                                                                                                                                                                 |                                                                                                              |                                                     |                                                                  |
| 21  | Time to the peak                                                                                                                                                                                 | =INDEX(FSA_T,MATCH(FSA_Peak,FSA_Rate,0))                                           | months                                                                                                                                                                                                                                                                                                                                                                                                                                                |                                                                                                              |                                                     |                                                                  |
| 22  | Peak over the facility capacity                                                                                                                                                                  | =FSA_Peak/FSA_Cap                                                                  | %                                                                                                                                                                                                                                                                                                                                                                                                                                                     |                                                                                                              |                                                     |                                                                  |
| 23  | Field rate at the horizon                                                                                                                                                                        | =INDEX(FSA_Rate,FSA_Rows+1)                                                        | STB/d                                                                                                                                                                                                                                                                                                                                                                                                                                                 |                                                                                                              |                                                     |                                                                  |
| 24  | Recovery to the Horizon                                                                                                                                                                          |                                                                                    |                                                                                                                                                                                                                                                                                                                                                                                                                                                       |                                                                                                              |                                                     |                                                                  |
| 25  | Cumulative at the horizon                                                                                                                                                                        | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,FSA_Horizon)*FSA_DMo/1000            | MSTB                                                                                                                                                                                                                                                                                                                                                                                                                                                  |                                                                                                              |                                                     |                                                                  |
| 26  | Cumulative per well                                                                                                                                                                              | =FSA_NpH/FSA_Wells                                                                 | MSTB                                                                                                                                                                                                                                                                                                                                                                                                                                                  |                                                                                                              |                                                     |                                                                  |
| 27  | One type well to the horizon                                                                                                                                                                     | =PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,FSA_Horizon)*FSA_DMo/1000                   | MSTB                                                                                                                                                                                                                                                                                                                                                                                                                                                  |                                                                                                              |                                                     |                                                                  |
| 28  | Schedule check                                                                                                                                                                                   | =IF(FSA_LastM>FSA_Horizon,"FAIL",IF(FSA_LastM>FSA_Horizon-FSA_MoYr,"WARN","PASS")) | =IF(FSA_LastM>FSA_Horizon,"the last well comes online after the "&TEXT(FSA_Horizon,"0")&"-month horizon: the wells past it aren't counted; add rigs or drill fewer wells",IF(FSA_LastM>FSA_Horizon-FSA_MoYr,"the last well comes online in month "&TEXT(FSA_LastM,"0")&", inside the horizon's last year: its decline isn't seen","the last well comes online in month "&TEXT(FSA_LastM,"0")&", within the "&TEXT(FSA_Horizon,"0")&"-month horizon")) |                                                                                                              |                                                     |                                                                  |
| 29  | Facility check                                                                                                                                                                                   | =IF(FSA_Peak<=FSA_Cap,"PASS","WARN")                                               | =IF(FSA_Peak<=FSA_Cap,"the field peaks at "&TEXT(FSA_Peak,"#,##0")&" STB/d in month "&TEXT(FSA_TPeak,"0")&", "&TEXT(FSA_PeakCap,"0%")&" of the "&TEXT(FSA_Cap,"#,##0")&" STB/d facility","the field peaks at "&TEXT(FSA_Peak,"#,##0")&" STB/d in month "&TEXT(FSA_TPeak,"0")&", above the "&TEXT(FSA_Cap,"#,##0")&" STB/d facility: slow the rigs, or hold a plateau as the field-profile sheet does")                                                |                                                                                                              |                                                     |                                                                  |
| 31  | Schedule and Forecast                                                                                                                                                                            |                                                                                    |                                                                                                                                                                                                                                                                                                                                                                                                                                                       |                                                                                                              |                                                     |                                                                  |
| 32  | The type well and the schedule are the reference development, synthetic. How to use it: the rig contract's wells and days, and a type well fitted to the offset wells' normalised monthly rates. |                                                                                    |                                                                                                                                                                                                                                                                                                                                                                                                                                                       |                                                                                                              |                                                     |                                                                  |
| 33  | A well finished in a month comes online at the start of the next; its first month's rate is the type well's average over its first month.                                                        |                                                                                    |                                                                                                                                                                                                                                                                                                                                                                                                                                                       |                                                                                                              |                                                     |                                                                  |
| 34  | Time (months)                                                                                                                                                                                    | Wells online (wells)                                                               | Wells starting (wells)                                                                                                                                                                                                                                                                                                                                                                                                                                | Type-well rate (STB/d)                                                                                       | Field rate (STB/d)                                  | Cumulative (MSTB)                                                |
| 35  | =0*FSA_Step                                                                                                                                                                                      | =MIN(FSA_Wells,INT(FSA_Pace*A35))                                                  | =B35                                                                                                                                                                                                                                                                                                                                                                                                                                                  | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A35+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A35))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A35)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A35)*FSA_DMo/1000  |
| 36  | =1*FSA_Step                                                                                                                                                                                      | =MIN(FSA_Wells,INT(FSA_Pace*A36))                                                  | =B36-B35                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A36+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A36))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A36)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A36)*FSA_DMo/1000  |
| 37  | =2*FSA_Step                                                                                                                                                                                      | =MIN(FSA_Wells,INT(FSA_Pace*A37))                                                  | =B37-B36                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A37+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A37))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A37)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A37)*FSA_DMo/1000  |
| 38  | =3*FSA_Step                                                                                                                                                                                      | =MIN(FSA_Wells,INT(FSA_Pace*A38))                                                  | =B38-B37                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A38+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A38))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A38)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A38)*FSA_DMo/1000  |
| 39  | =4*FSA_Step                                                                                                                                                                                      | =MIN(FSA_Wells,INT(FSA_Pace*A39))                                                  | =B39-B38                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A39+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A39))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A39)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A39)*FSA_DMo/1000  |
| 40  | =5*FSA_Step                                                                                                                                                                                      | =MIN(FSA_Wells,INT(FSA_Pace*A40))                                                  | =B40-B39                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A40+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A40))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A40)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A40)*FSA_DMo/1000  |
| 41  | =6*FSA_Step                                                                                                                                                                                      | =MIN(FSA_Wells,INT(FSA_Pace*A41))                                                  | =B41-B40                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A41+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A41))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A41)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A41)*FSA_DMo/1000  |
| 42  | =7*FSA_Step                                                                                                                                                                                      | =MIN(FSA_Wells,INT(FSA_Pace*A42))                                                  | =B42-B41                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A42+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A42))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A42)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A42)*FSA_DMo/1000  |
| 43  | =8*FSA_Step                                                                                                                                                                                      | =MIN(FSA_Wells,INT(FSA_Pace*A43))                                                  | =B43-B42                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A43+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A43))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A43)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A43)*FSA_DMo/1000  |
| 44  | =9*FSA_Step                                                                                                                                                                                      | =MIN(FSA_Wells,INT(FSA_Pace*A44))                                                  | =B44-B43                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A44+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A44))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A44)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A44)*FSA_DMo/1000  |
| 45  | =10*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A45))                                                  | =B45-B44                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A45+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A45))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A45)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A45)*FSA_DMo/1000  |
| 46  | =11*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A46))                                                  | =B46-B45                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A46+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A46))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A46)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A46)*FSA_DMo/1000  |
| 47  | =12*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A47))                                                  | =B47-B46                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A47+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A47))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A47)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A47)*FSA_DMo/1000  |
| 48  | =13*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A48))                                                  | =B48-B47                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A48+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A48))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A48)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A48)*FSA_DMo/1000  |
| 49  | =14*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A49))                                                  | =B49-B48                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A49+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A49))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A49)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A49)*FSA_DMo/1000  |
| 50  | =15*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A50))                                                  | =B50-B49                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A50+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A50))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A50)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A50)*FSA_DMo/1000  |
| 51  | =16*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A51))                                                  | =B51-B50                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A51+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A51))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A51)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A51)*FSA_DMo/1000  |
| 52  | =17*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A52))                                                  | =B52-B51                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A52+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A52))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A52)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A52)*FSA_DMo/1000  |
| 53  | =18*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A53))                                                  | =B53-B52                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A53+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A53))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A53)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A53)*FSA_DMo/1000  |
| 54  | =19*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A54))                                                  | =B54-B53                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A54+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A54))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A54)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A54)*FSA_DMo/1000  |
| 55  | =20*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A55))                                                  | =B55-B54                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A55+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A55))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A55)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A55)*FSA_DMo/1000  |
| 56  | =21*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A56))                                                  | =B56-B55                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A56+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A56))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A56)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A56)*FSA_DMo/1000  |
| 57  | =22*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A57))                                                  | =B57-B56                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A57+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A57))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A57)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A57)*FSA_DMo/1000  |
| 58  | =23*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A58))                                                  | =B58-B57                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A58+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A58))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A58)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A58)*FSA_DMo/1000  |
| 59  | =24*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A59))                                                  | =B59-B58                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A59+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A59))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A59)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A59)*FSA_DMo/1000  |
| 60  | =25*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A60))                                                  | =B60-B59                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A60+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A60))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A60)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A60)*FSA_DMo/1000  |
| 61  | =26*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A61))                                                  | =B61-B60                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A61+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A61))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A61)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A61)*FSA_DMo/1000  |
| 62  | =27*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A62))                                                  | =B62-B61                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A62+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A62))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A62)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A62)*FSA_DMo/1000  |
| 63  | =28*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A63))                                                  | =B63-B62                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A63+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A63))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A63)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A63)*FSA_DMo/1000  |
| 64  | =29*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A64))                                                  | =B64-B63                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A64+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A64))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A64)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A64)*FSA_DMo/1000  |
| 65  | =30*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A65))                                                  | =B65-B64                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A65+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A65))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A65)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A65)*FSA_DMo/1000  |
| 66  | =31*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A66))                                                  | =B66-B65                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A66+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A66))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A66)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A66)*FSA_DMo/1000  |
| 67  | =32*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A67))                                                  | =B67-B66                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A67+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A67))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A67)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A67)*FSA_DMo/1000  |
| 68  | =33*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A68))                                                  | =B68-B67                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A68+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A68))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A68)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A68)*FSA_DMo/1000  |
| 69  | =34*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A69))                                                  | =B69-B68                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A69+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A69))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A69)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A69)*FSA_DMo/1000  |
| 70  | =35*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A70))                                                  | =B70-B69                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A70+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A70))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A70)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A70)*FSA_DMo/1000  |
| 71  | =36*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A71))                                                  | =B71-B70                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A71+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A71))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A71)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A71)*FSA_DMo/1000  |
| 72  | =37*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A72))                                                  | =B72-B71                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A72+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A72))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A72)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A72)*FSA_DMo/1000  |
| 73  | =38*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A73))                                                  | =B73-B72                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A73+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A73))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A73)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A73)*FSA_DMo/1000  |
| 74  | =39*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A74))                                                  | =B74-B73                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A74+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A74))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A74)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A74)*FSA_DMo/1000  |
| 75  | =40*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A75))                                                  | =B75-B74                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A75+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A75))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A75)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A75)*FSA_DMo/1000  |
| 76  | =41*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A76))                                                  | =B76-B75                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A76+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A76))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A76)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A76)*FSA_DMo/1000  |
| 77  | =42*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A77))                                                  | =B77-B76                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A77+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A77))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A77)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A77)*FSA_DMo/1000  |
| 78  | =43*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A78))                                                  | =B78-B77                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A78+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A78))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A78)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A78)*FSA_DMo/1000  |
| 79  | =44*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A79))                                                  | =B79-B78                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A79+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A79))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A79)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A79)*FSA_DMo/1000  |
| 80  | =45*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A80))                                                  | =B80-B79                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A80+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A80))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A80)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A80)*FSA_DMo/1000  |
| 81  | =46*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A81))                                                  | =B81-B80                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A81+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A81))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A81)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A81)*FSA_DMo/1000  |
| 82  | =47*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A82))                                                  | =B82-B81                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A82+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A82))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A82)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A82)*FSA_DMo/1000  |
| 83  | =48*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A83))                                                  | =B83-B82                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A83+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A83))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A83)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A83)*FSA_DMo/1000  |
| 84  | =49*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A84))                                                  | =B84-B83                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A84+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A84))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A84)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A84)*FSA_DMo/1000  |
| 85  | =50*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A85))                                                  | =B85-B84                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A85+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A85))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A85)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A85)*FSA_DMo/1000  |
| 86  | =51*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A86))                                                  | =B86-B85                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A86+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A86))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A86)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A86)*FSA_DMo/1000  |
| 87  | =52*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A87))                                                  | =B87-B86                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A87+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A87))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A87)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A87)*FSA_DMo/1000  |
| 88  | =53*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A88))                                                  | =B88-B87                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A88+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A88))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A88)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A88)*FSA_DMo/1000  |
| 89  | =54*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A89))                                                  | =B89-B88                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A89+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A89))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A89)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A89)*FSA_DMo/1000  |
| 90  | =55*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A90))                                                  | =B90-B89                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A90+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A90))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A90)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A90)*FSA_DMo/1000  |
| 91  | =56*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A91))                                                  | =B91-B90                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A91+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A91))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A91)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A91)*FSA_DMo/1000  |
| 92  | =57*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A92))                                                  | =B92-B91                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A92+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A92))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A92)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A92)*FSA_DMo/1000  |
| 93  | =58*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A93))                                                  | =B93-B92                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A93+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A93))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A93)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A93)*FSA_DMo/1000  |
| 94  | =59*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A94))                                                  | =B94-B93                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A94+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A94))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A94)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A94)*FSA_DMo/1000  |
| 95  | =60*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A95))                                                  | =B95-B94                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A95+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A95))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A95)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A95)*FSA_DMo/1000  |
| 96  | =61*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A96))                                                  | =B96-B95                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A96+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A96))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A96)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A96)*FSA_DMo/1000  |
| 97  | =62*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A97))                                                  | =B97-B96                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A97+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A97))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A97)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A97)*FSA_DMo/1000  |
| 98  | =63*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A98))                                                  | =B98-B97                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A98+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A98))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A98)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A98)*FSA_DMo/1000  |
| 99  | =64*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A99))                                                  | =B99-B98                                                                                                                                                                                                                                                                                                                                                                                                                                              | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A99+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A99))/FSA_Step   | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A99)  | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A99)*FSA_DMo/1000  |
| 100 | =65*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A100))                                                 | =B100-B99                                                                                                                                                                                                                                                                                                                                                                                                                                             | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A100+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A100))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A100) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A100)*FSA_DMo/1000 |
| 101 | =66*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A101))                                                 | =B101-B100                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A101+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A101))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A101) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A101)*FSA_DMo/1000 |
| 102 | =67*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A102))                                                 | =B102-B101                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A102+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A102))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A102) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A102)*FSA_DMo/1000 |
| 103 | =68*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A103))                                                 | =B103-B102                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A103+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A103))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A103) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A103)*FSA_DMo/1000 |
| 104 | =69*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A104))                                                 | =B104-B103                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A104+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A104))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A104) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A104)*FSA_DMo/1000 |
| 105 | =70*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A105))                                                 | =B105-B104                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A105+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A105))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A105) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A105)*FSA_DMo/1000 |
| 106 | =71*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A106))                                                 | =B106-B105                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A106+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A106))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A106) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A106)*FSA_DMo/1000 |
| 107 | =72*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A107))                                                 | =B107-B106                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A107+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A107))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A107) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A107)*FSA_DMo/1000 |
| 108 | =73*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A108))                                                 | =B108-B107                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A108+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A108))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A108) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A108)*FSA_DMo/1000 |
| 109 | =74*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A109))                                                 | =B109-B108                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A109+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A109))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A109) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A109)*FSA_DMo/1000 |
| 110 | =75*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A110))                                                 | =B110-B109                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A110+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A110))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A110) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A110)*FSA_DMo/1000 |
| 111 | =76*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A111))                                                 | =B111-B110                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A111+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A111))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A111) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A111)*FSA_DMo/1000 |
| 112 | =77*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A112))                                                 | =B112-B111                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A112+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A112))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A112) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A112)*FSA_DMo/1000 |
| 113 | =78*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A113))                                                 | =B113-B112                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A113+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A113))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A113) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A113)*FSA_DMo/1000 |
| 114 | =79*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A114))                                                 | =B114-B113                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A114+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A114))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A114) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A114)*FSA_DMo/1000 |
| 115 | =80*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A115))                                                 | =B115-B114                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A115+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A115))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A115) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A115)*FSA_DMo/1000 |
| 116 | =81*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A116))                                                 | =B116-B115                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A116+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A116))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A116) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A116)*FSA_DMo/1000 |
| 117 | =82*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A117))                                                 | =B117-B116                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A117+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A117))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A117) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A117)*FSA_DMo/1000 |
| 118 | =83*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A118))                                                 | =B118-B117                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A118+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A118))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A118) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A118)*FSA_DMo/1000 |
| 119 | =84*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A119))                                                 | =B119-B118                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A119+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A119))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A119) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A119)*FSA_DMo/1000 |
| 120 | =85*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A120))                                                 | =B120-B119                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A120+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A120))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A120) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A120)*FSA_DMo/1000 |
| 121 | =86*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A121))                                                 | =B121-B120                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A121+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A121))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A121) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A121)*FSA_DMo/1000 |
| 122 | =87*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A122))                                                 | =B122-B121                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A122+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A122))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A122) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A122)*FSA_DMo/1000 |
| 123 | =88*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A123))                                                 | =B123-B122                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A123+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A123))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A123) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A123)*FSA_DMo/1000 |
| 124 | =89*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A124))                                                 | =B124-B123                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A124+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A124))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A124) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A124)*FSA_DMo/1000 |
| 125 | =90*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A125))                                                 | =B125-B124                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A125+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A125))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A125) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A125)*FSA_DMo/1000 |
| 126 | =91*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A126))                                                 | =B126-B125                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A126+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A126))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A126) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A126)*FSA_DMo/1000 |
| 127 | =92*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A127))                                                 | =B127-B126                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A127+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A127))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A127) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A127)*FSA_DMo/1000 |
| 128 | =93*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A128))                                                 | =B128-B127                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A128+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A128))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A128) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A128)*FSA_DMo/1000 |
| 129 | =94*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A129))                                                 | =B129-B128                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A129+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A129))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A129) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A129)*FSA_DMo/1000 |
| 130 | =95*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A130))                                                 | =B130-B129                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A130+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A130))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A130) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A130)*FSA_DMo/1000 |
| 131 | =96*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A131))                                                 | =B131-B130                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A131+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A131))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A131) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A131)*FSA_DMo/1000 |
| 132 | =97*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A132))                                                 | =B132-B131                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A132+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A132))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A132) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A132)*FSA_DMo/1000 |
| 133 | =98*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A133))                                                 | =B133-B132                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A133+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A133))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A133) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A133)*FSA_DMo/1000 |
| 134 | =99*FSA_Step                                                                                                                                                                                     | =MIN(FSA_Wells,INT(FSA_Pace*A134))                                                 | =B134-B133                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A134+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A134))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A134) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A134)*FSA_DMo/1000 |
| 135 | =100*FSA_Step                                                                                                                                                                                    | =MIN(FSA_Wells,INT(FSA_Pace*A135))                                                 | =B135-B134                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A135+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A135))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A135) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A135)*FSA_DMo/1000 |
| 136 | =101*FSA_Step                                                                                                                                                                                    | =MIN(FSA_Wells,INT(FSA_Pace*A136))                                                 | =B136-B135                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A136+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A136))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A136) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A136)*FSA_DMo/1000 |
| 137 | =102*FSA_Step                                                                                                                                                                                    | =MIN(FSA_Wells,INT(FSA_Pace*A137))                                                 | =B137-B136                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A137+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A137))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A137) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A137)*FSA_DMo/1000 |
| 138 | =103*FSA_Step                                                                                                                                                                                    | =MIN(FSA_Wells,INT(FSA_Pace*A138))                                                 | =B138-B137                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A138+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A138))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A138) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A138)*FSA_DMo/1000 |
| 139 | =104*FSA_Step                                                                                                                                                                                    | =MIN(FSA_Wells,INT(FSA_Pace*A139))                                                 | =B139-B138                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A139+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A139))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A139) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A139)*FSA_DMo/1000 |
| 140 | =105*FSA_Step                                                                                                                                                                                    | =MIN(FSA_Wells,INT(FSA_Pace*A140))                                                 | =B140-B139                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A140+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A140))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A140) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A140)*FSA_DMo/1000 |
| 141 | =106*FSA_Step                                                                                                                                                                                    | =MIN(FSA_Wells,INT(FSA_Pace*A141))                                                 | =B141-B140                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A141+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A141))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A141) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A141)*FSA_DMo/1000 |
| 142 | =107*FSA_Step                                                                                                                                                                                    | =MIN(FSA_Wells,INT(FSA_Pace*A142))                                                 | =B142-B141                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A142+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A142))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A142) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A142)*FSA_DMo/1000 |
| 143 | =108*FSA_Step                                                                                                                                                                                    | =MIN(FSA_Wells,INT(FSA_Pace*A143))                                                 | =B143-B142                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A143+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A143))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A143) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A143)*FSA_DMo/1000 |
| 144 | =109*FSA_Step                                                                                                                                                                                    | =MIN(FSA_Wells,INT(FSA_Pace*A144))                                                 | =B144-B143                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A144+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A144))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A144) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A144)*FSA_DMo/1000 |
| 145 | =110*FSA_Step                                                                                                                                                                                    | =MIN(FSA_Wells,INT(FSA_Pace*A145))                                                 | =B145-B144                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A145+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A145))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A145) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A145)*FSA_DMo/1000 |
| 146 | =111*FSA_Step                                                                                                                                                                                    | =MIN(FSA_Wells,INT(FSA_Pace*A146))                                                 | =B146-B145                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A146+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A146))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A146) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A146)*FSA_DMo/1000 |
| 147 | =112*FSA_Step                                                                                                                                                                                    | =MIN(FSA_Wells,INT(FSA_Pace*A147))                                                 | =B147-B146                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A147+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A147))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A147) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A147)*FSA_DMo/1000 |
| 148 | =113*FSA_Step                                                                                                                                                                                    | =MIN(FSA_Wells,INT(FSA_Pace*A148))                                                 | =B148-B147                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A148+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A148))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A148) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A148)*FSA_DMo/1000 |
| 149 | =114*FSA_Step                                                                                                                                                                                    | =MIN(FSA_Wells,INT(FSA_Pace*A149))                                                 | =B149-B148                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A149+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A149))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A149) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A149)*FSA_DMo/1000 |
| 150 | =115*FSA_Step                                                                                                                                                                                    | =MIN(FSA_Wells,INT(FSA_Pace*A150))                                                 | =B150-B149                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A150+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A150))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A150) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A150)*FSA_DMo/1000 |
| 151 | =116*FSA_Step                                                                                                                                                                                    | =MIN(FSA_Wells,INT(FSA_Pace*A151))                                                 | =B151-B150                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A151+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A151))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A151) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A151)*FSA_DMo/1000 |
| 152 | =117*FSA_Step                                                                                                                                                                                    | =MIN(FSA_Wells,INT(FSA_Pace*A152))                                                 | =B152-B151                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A152+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A152))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A152) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A152)*FSA_DMo/1000 |
| 153 | =118*FSA_Step                                                                                                                                                                                    | =MIN(FSA_Wells,INT(FSA_Pace*A153))                                                 | =B153-B152                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A153+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A153))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A153) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A153)*FSA_DMo/1000 |
| 154 | =119*FSA_Step                                                                                                                                                                                    | =MIN(FSA_Wells,INT(FSA_Pace*A154))                                                 | =B154-B153                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A154+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A154))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A154) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A154)*FSA_DMo/1000 |
| 155 | =120*FSA_Step                                                                                                                                                                                    | =MIN(FSA_Wells,INT(FSA_Pace*A155))                                                 | =B155-B154                                                                                                                                                                                                                                                                                                                                                                                                                                            | =(PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A155+FSA_Step)-PO.DCA.Arps.Prod(FSA_qi,FSA_DiM,FSA_b,A155))/FSA_Step | =PO.FPP.Sched.Rate(FSA_T,FSA_TypeQ,FSA_Starts,A155) | =PO.FPP.Sched.Prod(FSA_T,FSA_TypeQ,FSA_Starts,A155)*FSA_DMo/1000 |
| 157 | Facility Line                                                                                                                                                                                    |                                                                                    |                                                                                                                                                                                                                                                                                                                                                                                                                                                       |                                                                                                              |                                                     |                                                                  |
| 158 | Time (months)                                                                                                                                                                                    | Facility capacity (STB/d)                                                          |                                                                                                                                                                                                                                                                                                                                                                                                                                                       |                                                                                                              |                                                     |                                                                  |
| 159 | =0                                                                                                                                                                                               | =FSA_Cap                                                                           |                                                                                                                                                                                                                                                                                                                                                                                                                                                       |                                                                                                              |                                                     |                                                                  |
| 160 | =FSA_Horizon                                                                                                                                                                                     | =FSA_Cap                                                                           |                                                                                                                                                                                                                                                                                                                                                                                                                                                       |                                                                                                              |                                                     |                                                                  |
| 162 | Calculation Constants                                                                                                                                                                            |                                                                                    |                                                                                                                                                                                                                                                                                                                                                                                                                                                       |                                                                                                              |                                                     |                                                                  |
| 163 | Months in a year                                                                                                                                                                                 | 12                                                                                 | months/yr                                                                                                                                                                                                                                                                                                                                                                                                                                             |                                                                                                              |                                                     |                                                                  |
| 164 | Days in a month, 365.25/12                                                                                                                                                                       | 30.4375                                                                            | days/month                                                                                                                                                                                                                                                                                                                                                                                                                                            |                                                                                                              |                                                     |                                                                  |
| 165 | Grid step, one month, the type well's time step                                                                                                                                                  | 1                                                                                  | months                                                                                                                                                                                                                                                                                                                                                                                                                                                |                                                                                                              |                                                     |                                                                  |
| 166 | Rows of the monthly grid after the first                                                                                                                                                         | 120                                                                                | —                                                                                                                                                                                                                                                                                                                                                                                                                                                     |                                                                                                              |                                                     |                                                                  |

## Names

| Name | RefersTo | Comment |
|------|----------|---------|
| FSA_qi | $B$4 | Type-well initial oil rate, qi, STB/d |
| FSA_Di | $B$5 | Type-well initial nominal decline, Di, 1/yr |
| FSA_b | $B$6 | Type-well hyperbolic exponent, b |
| FSA_Rigs | $B$8 | Rigs drilling, rigs |
| FSA_DaysWell | $B$9 | Days a rig takes for one well, days |
| FSA_Wells | $B$10 | Wells to drill, wells |
| FSA_Cap | $B$11 | Facility oil capacity, STB/d |
| FSA_Inputs | $B$4:$B$11 | The type well's Arps qi, Di and b, the rigs, the days a well, the wells to drill and the facility capacity |
| FSA_DiM | $B$14 | Nominal decline per month, Di/12, 1/month |
| FSA_Pace | $B$15 | Drilling pace, rigs × days in a month / days a well, wells/month |
| FSA_DrillM | $B$16 | Drilling time, wells / pace, months |
| FSA_LastM | $B$17 | Month the last well comes online, months |
| FSA_Horizon | $B$18 | Horizon, the grid's last month, months |
| FSA_Peak | $B$20 | Peak field rate, STB/d |
| FSA_TPeak | $B$21 | Time to the peak, months |
| FSA_PeakCap | $B$22 | Peak over the facility capacity, % |
| FSA_RateEnd | $B$23 | Field rate at the horizon, STB/d |
| FSA_NpH | $B$25 | Cumulative at the horizon, MSTB |
| FSA_NpWell | $B$26 | Cumulative per well, MSTB |
| FSA_NpType | $B$27 | One type well to the horizon, MSTB |
| FSA_SchedCheck | $B$28 | Schedule check verdict |
| FSA_SchedCheckNote | $C$28 | Schedule check comment |
| FSA_CapCheck | $B$29 | Facility check verdict |
| FSA_CapCheckNote | $C$29 | Facility check comment |
| FSA_Results | $B$14:$B$29 | The monthly decline, the drilling pace and time, the last well's month, the horizon, the peak rate and the time to it, the peak against the facility, the rate and cumulative at the horizon, per well and for the type well, and the two checks |
| FSA_Curve | $A$35:$F$155 | The monthly grid: time, the wells online and starting, the type well's rate in its month, the field rate and the cumulative |
| FSA_T | $A$35:$A$155 | Grid times, months |
| FSA_Online | $B$35:$B$155 | Wells online by each month |
| FSA_Starts | $C$35:$C$155 | Wells starting production in each month, the schedule |
| FSA_TypeQ | $D$35:$D$155 | Type-well average rate in each month on production, STB/d |
| FSA_Rate | $E$35:$E$155 | Field rate in each month, STB/d |
| FSA_Line | $A$159:$B$160 | The facility capacity drawn across the rate chart, from month zero to the horizon |
| FSA_MoYr | $B$163 | Months in a year, months/yr |
| FSA_DMo | $B$164 | Days in a month, 365.25/12, days/month |
| FSA_Step | $B$165 | Grid step, one month, the type well's time step, months |
| FSA_Rows | $B$166 | Rows of the monthly grid after the first |

---

## Related Blueprints
- [Field Production Profile with Facility and Well Limits](/blueprint/po.fpp.field.profile.md)
- [Production Back-Allocation by Well Test and Uptime](/blueprint/po.fpp.allocation.md)
- [Arps EUR Sensitivity](/blueprint/po.dca.eur.sensitivity.md)
- [ESP Cable Sizing and Voltage Drop](/blueprint/po.esp.cable.analysis.md)
- [CO2 Corrosion and Material Selection](/blueprint/po.fa.corrosion.analysis.md)
- [Erosional Velocity of a Multiphase Line (API RP 14E)](/blueprint/po.fa.erosion.analysis.md)

