---
cid: po.bp.fpp.field.profile
hub: fpp
tags: [field, buildup, plateau, decline, forecast, production, facility, economic-limit, EUR, type-well]
facets: { discipline: production, property: production-forecast }
title: Field Production Profile with Facility and Well Limits
summary: "How long a field holds its plateau, when it stops paying and what it recovers, with the plateau set by the facility or the wells."
slug: po.fpp.field.profile
type: worksheet
---

# Field Production Profile with Facility and Well Limits

## Description

How long will the field hold its plateau, when does it stop paying, and how much oil will it make? You enter the facility's capacity, the wells and the rate each holds, the buildup and plateau times, and the type well's Arps decline and economic limit. You read off which of the facility or the wells sets the plateau rate and how many wells fill the facility, the plateau's end, the time to the field's economic limit, the EUR to it, and the EUR per well against the type well's own.

**Parameters:**
- **Facility and wells**: the facility oil capacity `FFP_Cap` (STB/d), the producing wells `FFP_Wells` and the rate each well holds through the plateau `FFP_qWell` (STB/d)
- **Timing**: the buildup time `FFP_tB` and the plateau duration `FFP_tP` (months)
- **Type well**: its initial rate `FFP_qi` (STB/d), initial nominal decline `FFP_Di` (1/yr), hyperbolic exponent `FFP_b`, and economic-limit rate per well `FFP_QEconW` (STB/d)
- **Display and grid**: the rate unit shown `FFP_RUnit` (STB/d or bbl/month) and the grid step `FFP_Step` (months per row; 60 steps)
- **Check limits**: the largest deliverability above the facility `FFP_SpareMax` and the largest EUR-per-well departure from the type well `FFP_EurBand`

**How to use it:** Take the facility's nameplate oil rate, the wells' tested rates choked back to the plan, the buildup from the drilling and hook-up schedule, and the decline fitted to the type well's normalised history with the Arps fitter. Set the economic limit per well from its operating cost over its netback per barrel. The field's rate is a buildup, a plateau and a decline: the plateau rate is the lesser of the facility's capacity and the wells' deliverability (the wells times the rate each can hold), and after the plateau the field declines on the type well's Arps decline. A pick-list shows the plateau rate and a forecast column in STB/d or bbl/month. The forecast grid has 61 rows, with a field-rate chart that draws the facility capacity, the economic limit and the plateau window, and a cumulative chart against the EUR. Three checks judge the plateau against the facility, the recovery per well against the type well's, and whether the grid reaches the limit.

**Method:** The sheet computes in months with rates in STB/d, so a cumulative is STB/d·month and the days in a month (365.25/12 = 30.4375) turn it into barrels; Di is typed per year and divided by 12. The deliverability is wells × rate per well, and the plateau rate qp = min(capacity, deliverability). The rate climbs linearly from zero to qp over the buildup tB, holds qp for the plateau tP, and from t0 = tB + tP declines as q = qp/(1 + b·Di·(t − t0))^(1/b). The cumulative is the buildup triangle qp·tB/2, the plateau rectangle qp·tP and the Arps cumulative after t0. The field's economic limit is wells × the limit per well; the time to it is t0 + ((qp/qecon)^b − 1)/(b·Di), and the EUR is the cumulative there. The type well's own EUR is the Arps EUR to the limit per well. The wells that fill the facility are capacity/rate per well, rounded up. The rate in bbl/month is the rate in STB/d × 30.4375.

**Example:** The default case is the field-profile family's reference development, the same on this sheet and on the Field Rate from a Drilling Schedule and a Type Well sheet: 24 producers of the decline family's tight-oil type well (qi 1,020 STB/d, Di 1.89/yr, b 0.93, the Arps Decline Forecast sheet's well), drilled by two rigs at 40 days a well into a 12,500 STB/d facility. The buildup is the 16 months the two rigs take to drill the wells; each well holds 550 STB/d through an 18-month plateau; the field is abandoned at 15 STB/d a well. The type-well decline is the same on both sheets.

The 24 wells deliver 24 × 550 = 13,200 STB/d, 5.6 % above the 12,500 STB/d facility, so the facility sets the plateau (23 wells would fill it). In bbl/month the plateau is 12,500 × 30.4375 = 380,469 bbl/month. The plateau ends at 16 + 18 = 34 months, 2.83 years, when (12,500 × 16/2 + 12,500 × 18) × 30.4375 = 325,000 × 30.4375 = 9,892.2 MSTB is produced. The field limit is 24 × 15 = 360 STB/d, reached ((12,500/360)^0.93 − 1)/(0.93 × 0.1575) = 26.09/0.14648 = 178.1 months after the plateau, at 212.1 months, 17.7 years. The decline adds 12,500/(0.07 × 0.1575) × [1 − (360/12,500)^0.07] × 30.4375 = 7,588.2 MSTB, so the EUR is 17,480.4 MSTB, 56.6 % of it by the plateau's end. That is 728.4 MSTB a well, 1.1 % above the type well's 720.2 MSTB to 15 STB/d, well inside the 25 % band. The 20-year grid runs past the limit.

## Validity

The buildup-plateau-decline profile is the screening model of field development planning: it treats the field as one tank whose rate a facility caps until the wells can no longer fill it. It holds where the plateau is a design choice (a facility sized below the wells' potential) and the decline after it is smooth. It doesn't follow the wells one by one: the buildup is a straight line rather than the steps of wells coming online, and the plateau length is an input, not the result of the wells' depletion. Here the post-plateau decline is the type well's initial decline, which is conservative for a field whose wells are older by then and decline more slowly; the recovery check guards the plateau length by holding the EUR per well near the type well's. Choked wells hold their plateau rate only while their pressure allows it, which a reservoir model or the material-balance sheets test.

Named alternatives: the Field Rate from a Drilling Schedule and a Type Well sheet, which convolves the type well with the rigs' schedule and shows the peak the facility must handle; the Arps Decline Forecast sheet for the type well itself; the Modified Hyperbolic Decline sheet when the field's decline should end on a terminal rate; a reservoir simulation for the plateau length.

## References

- Arps, J.J. (1945). "Analysis of Decline Curves." *Trans. AIME* 160, 228–247.
- Jahn, F., Cook, M. and Graham, M. (2008). *Hydrocarbon Exploration and Production*, 2nd ed., Elsevier, ch. 13 (field development planning: buildup, plateau and decline, and facility sizing).
- Mian, M.A. (2011). *Project Economics and Decision Analysis*, Vol. 1, 2nd ed., PennWell (production profiles and the economic limit).
- SPEE (2016). *Monograph 4: Estimating Ultimate Recovery of Developed Wells in Low-Permeability Reservoirs*, Society of Petroleum Evaluation Engineers (type wells and their EUR).

## Functions used

`PO.FPP.Field.Rate`, `PO.FPP.Field.Prod`, `PO.DCA.Arps.Time`, `PO.DCA.Arps.EUR`

## Spreadsheet: FppFieldProfile

|     | A                                                                                                                                                                                                   | B                                                                             | C                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               | D                                                           | E                       | F                                                                        | G                         | H                      | I          |
|-----|-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------|-------------------------------------------------------------------------------|---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------|-------------------------------------------------------------|-------------------------|--------------------------------------------------------------------------|---------------------------|------------------------|------------|
| 1   | Field Production Profile with Facility and Well Limits                                                                                                                                              |                                                                               | Petroleum Office                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                |                                                             |                         |                                                                          |                           |                        |            |
| 2   | Blue cells on yellow are inputs. Type the facility, the wells and the profile's timing; the plateau, its end, the economic limit, the EUR and the forecast follow.                                  |                                                                               |                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 |                                                             |                         |                                                                          |                           |                        |            |
| 3   | Facility and Wells                                                                                                                                                                                  |                                                                               |                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 |                                                             |                         |                                                                          |                           |                        |            |
| 4   | Facility oil capacity                                                                                                                                                                               | 12500                                                                         | STB/d                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           |                                                             |                         |                                                                          |                           |                        |            |
| 5   | Producing wells                                                                                                                                                                                     | 24                                                                            | wells                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           |                                                             |                         |                                                                          |                           |                        |            |
| 6   | Rate each well holds through the plateau                                                                                                                                                            | 550                                                                           | STB/d                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           |                                                             |                         |                                                                          |                           |                        |            |
| 7   | Profile Timing                                                                                                                                                                                      |                                                                               |                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 |                                                             |                         |                                                                          |                           |                        |            |
| 8   | Buildup time, first oil to plateau                                                                                                                                                                  | 16                                                                            | months                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          |                                                             |                         |                                                                          |                           |                        |            |
| 9   | Plateau duration                                                                                                                                                                                    | 18                                                                            | months                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          |                                                             |                         |                                                                          |                           |                        |            |
| 10  | Type-Well Decline after the Plateau                                                                                                                                                                 |                                                                               |                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 |                                                             |                         |                                                                          |                           |                        |            |
| 11  | Type-well initial oil rate, qi                                                                                                                                                                      | 1020                                                                          | STB/d                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           |                                                             |                         |                                                                          |                           |                        |            |
| 12  | Type-well initial nominal decline, Di                                                                                                                                                               | 1.89                                                                          | 1/yr                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            |                                                             |                         |                                                                          |                           |                        |            |
| 13  | Type-well hyperbolic exponent, b                                                                                                                                                                    | 0.93                                                                          | —                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               |                                                             |                         |                                                                          |                           |                        |            |
| 14  | Economic-limit oil rate per well                                                                                                                                                                    | 15                                                                            | STB/d                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           |                                                             |                         |                                                                          |                           |                        |            |
| 15  | Display, Grid and Checks                                                                                                                                                                            |                                                                               |                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 |                                                             |                         |                                                                          |                           |                        |            |
| 16  | Rate unit shown (STB/d or bbl/month)                                                                                                                                                                | STB/d                                                                         | —                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               |                                                             |                         |                                                                          |                           |                        |            |
| 17  | Grid step, months per row                                                                                                                                                                           | 4                                                                             | months                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          |                                                             |                         |                                                                          |                           |                        |            |
| 18  | Largest deliverability above the facility                                                                                                                                                           | 0.25                                                                          | %                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               |                                                             |                         |                                                                          |                           |                        |            |
| 19  | Largest EUR-per-well departure from the type well                                                                                                                                                   | 0.25                                                                          | %                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               |                                                             |                         |                                                                          |                           |                        |            |
| 21  | Plateau                                                                                                                                                                                             |                                                                               |                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 |                                                             |                         |                                                                          |                           |                        |            |
| 22  | Wells' deliverability, wells × rate per well                                                                                                                                                        | =FFP_Wells*FFP_qWell                                                          | STB/d                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           |                                                             |                         |                                                                          |                           |                        |            |
| 23  | Plateau rate, the lesser of facility and wells                                                                                                                                                      | =MIN(FFP_Cap,FFP_Deliv)                                                       | STB/d                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           |                                                             |                         |                                                                          |                           |                        |            |
| 24  | Plateau set by                                                                                                                                                                                      | =""&IF(FFP_Deliv>=FFP_Cap,"the facility","the wells")                         |                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 |                                                             |                         |                                                                          |                           |                        |            |
| 25  | Wells that fill the facility                                                                                                                                                                        | =ROUNDUP(FFP_Cap/FFP_qWell,0)                                                 | wells                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           |                                                             |                         |                                                                          |                           |                        |            |
| 26  | Deliverability above the facility                                                                                                                                                                   | =FFP_Deliv/FFP_Cap-1                                                          | %                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               |                                                             |                         |                                                                          |                           |                        |            |
| 27  | Shown unit per STB/d (1, or days in a month)                                                                                                                                                        | =IF(FFP_RUnit="bbl/month",FFP_DMo,1)                                          | —                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               |                                                             |                         |                                                                          |                           |                        |            |
| 28  | Plateau rate in the unit shown                                                                                                                                                                      | =FFP_Qp*FFP_RateF                                                             | unit shown                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      |                                                             |                         |                                                                          |                           |                        |            |
| 29  | Plateau End and Economic Limit                                                                                                                                                                      |                                                                               |                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 |                                                             |                         |                                                                          |                           |                        |            |
| 30  | Plateau end, buildup + plateau                                                                                                                                                                      | =FFP_tB+FFP_tP                                                                | months                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          |                                                             |                         |                                                                          |                           |                        |            |
| 31  | Plateau end in years                                                                                                                                                                                | =FFP_t0/FFP_MoYr                                                              | years                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           |                                                             |                         |                                                                          |                           |                        |            |
| 32  | Nominal decline per month, Di/12                                                                                                                                                                    | =FFP_Di/FFP_MoYr                                                              | 1/month                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         |                                                             |                         |                                                                          |                           |                        |            |
| 33  | Field economic limit, wells × limit per well                                                                                                                                                        | =FFP_Wells*FFP_QEconW                                                         | STB/d                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           |                                                             |                         |                                                                          |                           |                        |            |
| 34  | Time to the economic limit                                                                                                                                                                          | =FFP_t0+PO.DCA.Arps.Time(FFP_Qp,FFP_DiM,FFP_b,FFP_QEcon)                      | months                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          |                                                             |                         |                                                                          |                           |                        |            |
| 35  | Time to the economic limit in years                                                                                                                                                                 | =FFP_TLimM/FFP_MoYr                                                           | years                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           |                                                             |                         |                                                                          |                           |                        |            |
| 36  | Recovery                                                                                                                                                                                            |                                                                               |                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 |                                                             |                         |                                                                          |                           |                        |            |
| 37  | Cumulative at the plateau end                                                                                                                                                                       | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,FFP_t0)*FFP_DMo/1000    | MSTB                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            |                                                             |                         |                                                                          |                           |                        |            |
| 38  | EUR to the economic limit                                                                                                                                                                           | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,FFP_TLimM)*FFP_DMo/1000 | MSTB                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            |                                                             |                         |                                                                          |                           |                        |            |
| 39  | Share of the EUR produced by the plateau end                                                                                                                                                        | =FFP_Npt0/FFP_EUR                                                             | %                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               |                                                             |                         |                                                                          |                           |                        |            |
| 40  | EUR per well                                                                                                                                                                                        | =FFP_EUR/FFP_Wells                                                            | MSTB                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            |                                                             |                         |                                                                          |                           |                        |            |
| 41  | Type well's EUR to its limit                                                                                                                                                                        | =PO.DCA.Arps.EUR(FFP_qi,FFP_DiM,FFP_b,FFP_QEconW)*FFP_DMo/1000                | MSTB                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            |                                                             |                         |                                                                          |                           |                        |            |
| 42  | EUR per well over the type well's, less one                                                                                                                                                         | =FFP_EURWell/FFP_EURType-1                                                    | %                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               |                                                             |                         |                                                                          |                           |                        |            |
| 43  | Time at the grid's end                                                                                                                                                                              | =FFP_Rows*FFP_Step/FFP_MoYr                                                   | years                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           |                                                             |                         |                                                                          |                           |                        |            |
| 44  | Plateau capacity check                                                                                                                                                                              | =IF(FFP_Deliv<FFP_Cap,"WARN",IF(FFP_Spare>FFP_SpareMax,"WARN","PASS"))        | =IF(FFP_Deliv<FFP_Cap,"the wells deliver "&TEXT(FFP_Deliv,"#,##0")&" STB/d, below the "&TEXT(FFP_Cap,"#,##0")&" STB/d facility: the plateau is well-limited; "&TEXT(FFP_WellsFill-FFP_Wells,"0")&" more wells fill it",IF(FFP_Spare>FFP_SpareMax,"the wells deliver "&TEXT(FFP_Spare,"0%")&" more than the facility takes, past "&TEXT(FFP_SpareMax,"0%")&": "&TEXT(FFP_Wells-FFP_WellsFill,"0")&" wells are spare","the plateau is the facility's "&TEXT(FFP_Cap,"#,##0")&" STB/d; the wells could deliver "&TEXT(FFP_Spare,"0.0%")&" more, within "&TEXT(FFP_SpareMax,"0%"))) |                                                             |                         |                                                                          |                           |                        |            |
| 45  | Recovery check                                                                                                                                                                                      | =IF(ABS(FFP_EURDiff)<=FFP_EurBand,"PASS","WARN")                              | =IF(ABS(FFP_EURDiff)<=FFP_EurBand,""&TEXT(FFP_EURWell,"#,##0")&" MSTB a well is "&TEXT(FFP_EURDiff,"+0.0%;-0.0%")&" from the type well's "&TEXT(FFP_EURType,"#,##0")&" MSTB, within "&TEXT(FFP_EurBand,"0%"),""&TEXT(FFP_EURWell,"#,##0")&" MSTB a well is "&TEXT(FFP_EURDiff,"+0.0%;-0.0%")&" from the type well's "&TEXT(FFP_EURType,"#,##0")&" MSTB, past "&TEXT(FFP_EurBand,"0%")&": the plateau claims oil the wells don't hold, or leaves some")                                                                                                                          |                                                             |                         |                                                                          |                           |                        |            |
| 46  | Grid check                                                                                                                                                                                          | =IF(FFP_GridEnd>=FFP_TLim,"PASS","WARN")                                      | =IF(FFP_GridEnd>=FFP_TLim,"the grid runs to "&TEXT(FFP_GridEnd,"0.0")&" years, past the limit at "&TEXT(FFP_TLim,"0.0")&" years","the grid ends at "&TEXT(FFP_GridEnd,"0.0")&" years, before the limit at "&TEXT(FFP_TLim,"0.0")&": lengthen the step")                                                                                                                                                                                                                                                                                                                         |                                                             |                         |                                                                          |                           |                        |            |
| 48  | Forecast                                                                                                                                                                                            |                                                                               |                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 |                                                             |                         |                                                                          |                           |                        |            |
| 49  | The field is the reference development, synthetic. How to use it: the facility's nameplate oil rate, the wells' tested rates choked to the plan, and the decline fitted to the type well's history. |                                                                               |                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 |                                                             |                         |                                                                          |                           |                        |            |
| 50  | Time (months)                                                                                                                                                                                       | Time (years)                                                                  | Phase                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           | Field rate (STB/d)                                          | Field rate (unit shown) | Cumulative (MSTB)                                                        | Facility capacity (STB/d) | Economic limit (STB/d) | EUR (MSTB) |
| 51  | =0*FFP_Step                                                                                                                                                                                         | =A51/FFP_MoYr                                                                 | =IF(A51<FFP_tB,"Buildup",IF(A51<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A51)  | =D51*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A51)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 52  | =1*FFP_Step                                                                                                                                                                                         | =A52/FFP_MoYr                                                                 | =IF(A52<FFP_tB,"Buildup",IF(A52<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A52)  | =D52*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A52)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 53  | =2*FFP_Step                                                                                                                                                                                         | =A53/FFP_MoYr                                                                 | =IF(A53<FFP_tB,"Buildup",IF(A53<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A53)  | =D53*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A53)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 54  | =3*FFP_Step                                                                                                                                                                                         | =A54/FFP_MoYr                                                                 | =IF(A54<FFP_tB,"Buildup",IF(A54<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A54)  | =D54*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A54)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 55  | =4*FFP_Step                                                                                                                                                                                         | =A55/FFP_MoYr                                                                 | =IF(A55<FFP_tB,"Buildup",IF(A55<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A55)  | =D55*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A55)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 56  | =5*FFP_Step                                                                                                                                                                                         | =A56/FFP_MoYr                                                                 | =IF(A56<FFP_tB,"Buildup",IF(A56<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A56)  | =D56*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A56)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 57  | =6*FFP_Step                                                                                                                                                                                         | =A57/FFP_MoYr                                                                 | =IF(A57<FFP_tB,"Buildup",IF(A57<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A57)  | =D57*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A57)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 58  | =7*FFP_Step                                                                                                                                                                                         | =A58/FFP_MoYr                                                                 | =IF(A58<FFP_tB,"Buildup",IF(A58<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A58)  | =D58*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A58)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 59  | =8*FFP_Step                                                                                                                                                                                         | =A59/FFP_MoYr                                                                 | =IF(A59<FFP_tB,"Buildup",IF(A59<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A59)  | =D59*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A59)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 60  | =9*FFP_Step                                                                                                                                                                                         | =A60/FFP_MoYr                                                                 | =IF(A60<FFP_tB,"Buildup",IF(A60<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A60)  | =D60*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A60)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 61  | =10*FFP_Step                                                                                                                                                                                        | =A61/FFP_MoYr                                                                 | =IF(A61<FFP_tB,"Buildup",IF(A61<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A61)  | =D61*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A61)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 62  | =11*FFP_Step                                                                                                                                                                                        | =A62/FFP_MoYr                                                                 | =IF(A62<FFP_tB,"Buildup",IF(A62<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A62)  | =D62*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A62)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 63  | =12*FFP_Step                                                                                                                                                                                        | =A63/FFP_MoYr                                                                 | =IF(A63<FFP_tB,"Buildup",IF(A63<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A63)  | =D63*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A63)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 64  | =13*FFP_Step                                                                                                                                                                                        | =A64/FFP_MoYr                                                                 | =IF(A64<FFP_tB,"Buildup",IF(A64<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A64)  | =D64*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A64)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 65  | =14*FFP_Step                                                                                                                                                                                        | =A65/FFP_MoYr                                                                 | =IF(A65<FFP_tB,"Buildup",IF(A65<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A65)  | =D65*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A65)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 66  | =15*FFP_Step                                                                                                                                                                                        | =A66/FFP_MoYr                                                                 | =IF(A66<FFP_tB,"Buildup",IF(A66<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A66)  | =D66*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A66)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 67  | =16*FFP_Step                                                                                                                                                                                        | =A67/FFP_MoYr                                                                 | =IF(A67<FFP_tB,"Buildup",IF(A67<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A67)  | =D67*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A67)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 68  | =17*FFP_Step                                                                                                                                                                                        | =A68/FFP_MoYr                                                                 | =IF(A68<FFP_tB,"Buildup",IF(A68<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A68)  | =D68*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A68)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 69  | =18*FFP_Step                                                                                                                                                                                        | =A69/FFP_MoYr                                                                 | =IF(A69<FFP_tB,"Buildup",IF(A69<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A69)  | =D69*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A69)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 70  | =19*FFP_Step                                                                                                                                                                                        | =A70/FFP_MoYr                                                                 | =IF(A70<FFP_tB,"Buildup",IF(A70<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A70)  | =D70*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A70)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 71  | =20*FFP_Step                                                                                                                                                                                        | =A71/FFP_MoYr                                                                 | =IF(A71<FFP_tB,"Buildup",IF(A71<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A71)  | =D71*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A71)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 72  | =21*FFP_Step                                                                                                                                                                                        | =A72/FFP_MoYr                                                                 | =IF(A72<FFP_tB,"Buildup",IF(A72<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A72)  | =D72*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A72)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 73  | =22*FFP_Step                                                                                                                                                                                        | =A73/FFP_MoYr                                                                 | =IF(A73<FFP_tB,"Buildup",IF(A73<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A73)  | =D73*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A73)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 74  | =23*FFP_Step                                                                                                                                                                                        | =A74/FFP_MoYr                                                                 | =IF(A74<FFP_tB,"Buildup",IF(A74<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A74)  | =D74*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A74)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 75  | =24*FFP_Step                                                                                                                                                                                        | =A75/FFP_MoYr                                                                 | =IF(A75<FFP_tB,"Buildup",IF(A75<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A75)  | =D75*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A75)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 76  | =25*FFP_Step                                                                                                                                                                                        | =A76/FFP_MoYr                                                                 | =IF(A76<FFP_tB,"Buildup",IF(A76<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A76)  | =D76*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A76)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 77  | =26*FFP_Step                                                                                                                                                                                        | =A77/FFP_MoYr                                                                 | =IF(A77<FFP_tB,"Buildup",IF(A77<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A77)  | =D77*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A77)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 78  | =27*FFP_Step                                                                                                                                                                                        | =A78/FFP_MoYr                                                                 | =IF(A78<FFP_tB,"Buildup",IF(A78<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A78)  | =D78*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A78)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 79  | =28*FFP_Step                                                                                                                                                                                        | =A79/FFP_MoYr                                                                 | =IF(A79<FFP_tB,"Buildup",IF(A79<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A79)  | =D79*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A79)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 80  | =29*FFP_Step                                                                                                                                                                                        | =A80/FFP_MoYr                                                                 | =IF(A80<FFP_tB,"Buildup",IF(A80<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A80)  | =D80*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A80)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 81  | =30*FFP_Step                                                                                                                                                                                        | =A81/FFP_MoYr                                                                 | =IF(A81<FFP_tB,"Buildup",IF(A81<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A81)  | =D81*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A81)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 82  | =31*FFP_Step                                                                                                                                                                                        | =A82/FFP_MoYr                                                                 | =IF(A82<FFP_tB,"Buildup",IF(A82<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A82)  | =D82*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A82)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 83  | =32*FFP_Step                                                                                                                                                                                        | =A83/FFP_MoYr                                                                 | =IF(A83<FFP_tB,"Buildup",IF(A83<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A83)  | =D83*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A83)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 84  | =33*FFP_Step                                                                                                                                                                                        | =A84/FFP_MoYr                                                                 | =IF(A84<FFP_tB,"Buildup",IF(A84<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A84)  | =D84*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A84)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 85  | =34*FFP_Step                                                                                                                                                                                        | =A85/FFP_MoYr                                                                 | =IF(A85<FFP_tB,"Buildup",IF(A85<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A85)  | =D85*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A85)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 86  | =35*FFP_Step                                                                                                                                                                                        | =A86/FFP_MoYr                                                                 | =IF(A86<FFP_tB,"Buildup",IF(A86<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A86)  | =D86*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A86)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 87  | =36*FFP_Step                                                                                                                                                                                        | =A87/FFP_MoYr                                                                 | =IF(A87<FFP_tB,"Buildup",IF(A87<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A87)  | =D87*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A87)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 88  | =37*FFP_Step                                                                                                                                                                                        | =A88/FFP_MoYr                                                                 | =IF(A88<FFP_tB,"Buildup",IF(A88<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A88)  | =D88*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A88)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 89  | =38*FFP_Step                                                                                                                                                                                        | =A89/FFP_MoYr                                                                 | =IF(A89<FFP_tB,"Buildup",IF(A89<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A89)  | =D89*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A89)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 90  | =39*FFP_Step                                                                                                                                                                                        | =A90/FFP_MoYr                                                                 | =IF(A90<FFP_tB,"Buildup",IF(A90<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A90)  | =D90*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A90)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 91  | =40*FFP_Step                                                                                                                                                                                        | =A91/FFP_MoYr                                                                 | =IF(A91<FFP_tB,"Buildup",IF(A91<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A91)  | =D91*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A91)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 92  | =41*FFP_Step                                                                                                                                                                                        | =A92/FFP_MoYr                                                                 | =IF(A92<FFP_tB,"Buildup",IF(A92<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A92)  | =D92*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A92)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 93  | =42*FFP_Step                                                                                                                                                                                        | =A93/FFP_MoYr                                                                 | =IF(A93<FFP_tB,"Buildup",IF(A93<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A93)  | =D93*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A93)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 94  | =43*FFP_Step                                                                                                                                                                                        | =A94/FFP_MoYr                                                                 | =IF(A94<FFP_tB,"Buildup",IF(A94<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A94)  | =D94*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A94)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 95  | =44*FFP_Step                                                                                                                                                                                        | =A95/FFP_MoYr                                                                 | =IF(A95<FFP_tB,"Buildup",IF(A95<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A95)  | =D95*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A95)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 96  | =45*FFP_Step                                                                                                                                                                                        | =A96/FFP_MoYr                                                                 | =IF(A96<FFP_tB,"Buildup",IF(A96<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A96)  | =D96*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A96)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 97  | =46*FFP_Step                                                                                                                                                                                        | =A97/FFP_MoYr                                                                 | =IF(A97<FFP_tB,"Buildup",IF(A97<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A97)  | =D97*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A97)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 98  | =47*FFP_Step                                                                                                                                                                                        | =A98/FFP_MoYr                                                                 | =IF(A98<FFP_tB,"Buildup",IF(A98<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A98)  | =D98*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A98)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 99  | =48*FFP_Step                                                                                                                                                                                        | =A99/FFP_MoYr                                                                 | =IF(A99<FFP_tB,"Buildup",IF(A99<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A99)  | =D99*FFP_RateF          | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A99)*FFP_DMo/1000  | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 100 | =49*FFP_Step                                                                                                                                                                                        | =A100/FFP_MoYr                                                                | =IF(A100<FFP_tB,"Buildup",IF(A100<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A100) | =D100*FFP_RateF         | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A100)*FFP_DMo/1000 | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 101 | =50*FFP_Step                                                                                                                                                                                        | =A101/FFP_MoYr                                                                | =IF(A101<FFP_tB,"Buildup",IF(A101<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A101) | =D101*FFP_RateF         | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A101)*FFP_DMo/1000 | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 102 | =51*FFP_Step                                                                                                                                                                                        | =A102/FFP_MoYr                                                                | =IF(A102<FFP_tB,"Buildup",IF(A102<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A102) | =D102*FFP_RateF         | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A102)*FFP_DMo/1000 | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 103 | =52*FFP_Step                                                                                                                                                                                        | =A103/FFP_MoYr                                                                | =IF(A103<FFP_tB,"Buildup",IF(A103<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A103) | =D103*FFP_RateF         | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A103)*FFP_DMo/1000 | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 104 | =53*FFP_Step                                                                                                                                                                                        | =A104/FFP_MoYr                                                                | =IF(A104<FFP_tB,"Buildup",IF(A104<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A104) | =D104*FFP_RateF         | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A104)*FFP_DMo/1000 | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 105 | =54*FFP_Step                                                                                                                                                                                        | =A105/FFP_MoYr                                                                | =IF(A105<FFP_tB,"Buildup",IF(A105<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A105) | =D105*FFP_RateF         | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A105)*FFP_DMo/1000 | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 106 | =55*FFP_Step                                                                                                                                                                                        | =A106/FFP_MoYr                                                                | =IF(A106<FFP_tB,"Buildup",IF(A106<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A106) | =D106*FFP_RateF         | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A106)*FFP_DMo/1000 | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 107 | =56*FFP_Step                                                                                                                                                                                        | =A107/FFP_MoYr                                                                | =IF(A107<FFP_tB,"Buildup",IF(A107<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A107) | =D107*FFP_RateF         | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A107)*FFP_DMo/1000 | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 108 | =57*FFP_Step                                                                                                                                                                                        | =A108/FFP_MoYr                                                                | =IF(A108<FFP_tB,"Buildup",IF(A108<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A108) | =D108*FFP_RateF         | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A108)*FFP_DMo/1000 | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 109 | =58*FFP_Step                                                                                                                                                                                        | =A109/FFP_MoYr                                                                | =IF(A109<FFP_tB,"Buildup",IF(A109<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A109) | =D109*FFP_RateF         | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A109)*FFP_DMo/1000 | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 110 | =59*FFP_Step                                                                                                                                                                                        | =A110/FFP_MoYr                                                                | =IF(A110<FFP_tB,"Buildup",IF(A110<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A110) | =D110*FFP_RateF         | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A110)*FFP_DMo/1000 | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 111 | =60*FFP_Step                                                                                                                                                                                        | =A111/FFP_MoYr                                                                | =IF(A111<FFP_tB,"Buildup",IF(A111<=FFP_t0,"Plateau","Decline"))                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 | =PO.FPP.Field.Rate(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A111) | =D111*FFP_RateF         | =PO.FPP.Field.Prod(FFP_tB,FFP_tP,FFP_Qp,FFP_DiM,FFP_b,A111)*FFP_DMo/1000 | =FFP_Cap                  | =FFP_QEcon             | =FFP_EUR   |
| 113 | Plateau Window                                                                                                                                                                                      |                                                                               |                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 |                                                             |                         |                                                                          |                           |                        |            |
| 114 | Time (years)                                                                                                                                                                                        | Plateau (STB/d)                                                               |                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 |                                                             |                         |                                                                          |                           |                        |            |
| 115 | =FFP_tB/FFP_MoYr                                                                                                                                                                                    | =0                                                                            |                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 |                                                             |                         |                                                                          |                           |                        |            |
| 116 | =FFP_tB/FFP_MoYr                                                                                                                                                                                    | =FFP_Qp                                                                       |                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 |                                                             |                         |                                                                          |                           |                        |            |
| 117 | =FFP_t0Y                                                                                                                                                                                            | =FFP_Qp                                                                       |                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 |                                                             |                         |                                                                          |                           |                        |            |
| 118 | =FFP_t0Y                                                                                                                                                                                            | =0                                                                            |                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 |                                                             |                         |                                                                          |                           |                        |            |
| 120 | Calculation Constants                                                                                                                                                                               |                                                                               |                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 |                                                             |                         |                                                                          |                           |                        |            |
| 121 | Months in a year                                                                                                                                                                                    | 12                                                                            | months/yr                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       |                                                             |                         |                                                                          |                           |                        |            |
| 122 | Days in a month, 365.25/12                                                                                                                                                                          | 30.4375                                                                       | days/month                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      |                                                             |                         |                                                                          |                           |                        |            |
| 123 | Rows of the forecast grid after the first                                                                                                                                                           | 60                                                                            | —                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               |                                                             |                         |                                                                          |                           |                        |            |

## Names

| Name | RefersTo | Comment |
|------|----------|---------|
| FFP_Cap | $B$4 | Facility oil capacity, STB/d |
| FFP_Wells | $B$5 | Producing wells, wells |
| FFP_qWell | $B$6 | Rate each well holds through the plateau, STB/d |
| FFP_tB | $B$8 | Buildup time, first oil to plateau, months |
| FFP_tP | $B$9 | Plateau duration, months |
| FFP_qi | $B$11 | Type-well initial oil rate, qi, STB/d |
| FFP_Di | $B$12 | Type-well initial nominal decline, Di, 1/yr |
| FFP_b | $B$13 | Type-well hyperbolic exponent, b |
| FFP_QEconW | $B$14 | Economic-limit oil rate per well, STB/d |
| FFP_RUnit | $B$16 | Unit the plateau rate and the forecast's second rate column are shown in, STB/d or bbl/month |
| FFP_Step | $B$17 | Grid step, months per row, months |
| FFP_SpareMax | $B$18 | Largest deliverability above the facility, % |
| FFP_EurBand | $B$19 | Largest EUR-per-well departure from the type well, % |
| FFP_Inputs | $B$4:$B$19 | The facility capacity, the wells and their plateau rate, the buildup and plateau times, the type well's decline and limit, the rate unit, the grid step and the two check limits |
| FFP_Deliv | $B$22 | Wells' deliverability, wells × rate per well, STB/d |
| FFP_Qp | $B$23 | Plateau rate, the lesser of facility and wells, STB/d |
| FFP_Limiter | $B$24 | Plateau set by |
| FFP_WellsFill | $B$25 | Wells that fill the facility, wells |
| FFP_Spare | $B$26 | Deliverability above the facility, % |
| FFP_RateF | $B$27 | Shown unit per STB/d (1, or days in a month) |
| FFP_QpShown | $B$28 | Plateau rate in the unit shown, unit shown |
| FFP_t0 | $B$30 | Plateau end, buildup + plateau, months |
| FFP_t0Y | $B$31 | Plateau end in years, years |
| FFP_DiM | $B$32 | Nominal decline per month, Di/12, 1/month |
| FFP_QEcon | $B$33 | Field economic limit, wells × limit per well, STB/d |
| FFP_TLimM | $B$34 | Time to the economic limit, months |
| FFP_TLim | $B$35 | Time to the economic limit in years, years |
| FFP_Npt0 | $B$37 | Cumulative at the plateau end, MSTB |
| FFP_EUR | $B$38 | EUR to the economic limit, MSTB |
| FFP_Sharet0 | $B$39 | Share of the EUR produced by the plateau end, % |
| FFP_EURWell | $B$40 | EUR per well, MSTB |
| FFP_EURType | $B$41 | Type well's EUR to its limit, MSTB |
| FFP_EURDiff | $B$42 | EUR per well over the type well's, less one, % |
| FFP_GridEnd | $B$43 | Time at the grid's end, years |
| FFP_CapCheck | $B$44 | Plateau capacity check verdict |
| FFP_CapCheckNote | $C$44 | Plateau capacity check comment |
| FFP_EURCheck | $B$45 | Recovery check verdict |
| FFP_EURCheckNote | $C$45 | Recovery check comment |
| FFP_GridCheck | $B$46 | Grid check verdict |
| FFP_GridCheckNote | $C$46 | Grid check comment |
| FFP_Results | $B$22:$B$46 | Deliverability, the plateau rate and what sets it, the wells that fill the facility, the plateau's end, the field's economic limit and time to it, the cumulative at plateau end, the EUR and per well against the type well, the grid's end, three checks |
| FFP_Curve | $A$51:$I$111 | The forecast grid: time in months and years, the phase, the field rate in STB/d and in the unit shown, the cumulative, and the facility capacity, economic limit and EUR as reference lines |
| FFP_Window | $A$115:$B$118 | The plateau window drawn on the rate chart: up at the buildup's end, across at the plateau rate, down at the plateau's end |
| FFP_MoYr | $B$121 | Months in a year, months/yr |
| FFP_DMo | $B$122 | Days in a month, 365.25/12, days/month |
| FFP_Rows | $B$123 | Rows of the forecast grid after the first |

---

## Related Blueprints
- [Field Rate from a Drilling Schedule and a Type Well](/blueprint/po.fpp.sched.aggregation.md)
- [Arps EUR Sensitivity](/blueprint/po.dca.eur.sensitivity.md)
- [Arps Decline Forecast](/blueprint/po.dca.arps.forecast.md)
- [Production Back-Allocation by Well Test and Uptime](/blueprint/po.fpp.allocation.md)
- [Modified Hyperbolic Decline](/blueprint/po.dca.modhyp.forecast.md)
- [Decline Model Comparison](/blueprint/po.dca.models.compare.md)

